ELE06-01980
| Electrical Rough-In | 6/5/2006 | 6/6/2006 | 6/6/2006 4:25:09 PM | P | PASS |
|
|
We need a wall inspection ; Phone #: ###-#### Internet Inspection Request from: DJ Carman walls only, soffit, and u/g ok to cover
|
ELE06-00457
| ELE-Aging Inspection | 6/6/2006 | 6/6/2006 | 6/6/2006 4:01:25 PM | | DONE |
|
|
suc
|
ELE06-00456
| ELE-Aging Inspection | 6/6/2006 | 6/6/2006 | 6/6/2006 3:54:51 PM | | DONE |
|
|
suc
|
ELE06-01442
| Final | 6/6/2006 | 6/6/2006 | 6/6/2006 3:27:16 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 7:50:04 AM. Contact: ###-####. ok to final
|
ELE06-02071
| Permanent Service | 6/6/2006 | 6/6/2006 | 6/6/2006 2:49:49 PM | P | FAIL |
|
|
bill ###-#### called contr left corr notice,nec 300.5 u/g cable shall be 24" deep, 312.5 abrasion protection shall be provided forr all conductors entering enclosures, 314.15(A) fittings installed in wet locations shall be listed for use in wet locations,BCC no cover shall be done prior to inspection
|
ELE06-02067
| Temporary Service | 6/6/2006 | 6/6/2006 | 6/6/2006 1:53:20 PM | P | PASS |
|
|
brian ###-#### t/s u/g n ok
|
ELE06-02025
| Temporary Service | 6/5/2006 | 6/6/2006 | 6/6/2006 1:31:27 PM | A | PASS |
|
|
verna; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley t/s u/g n ok
|
ELE05-04387
| Final | 6/6/2006 | 6/6/2006 | 6/6/2006 12:53:56 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 8:48:09 AM. looked at electrical and told that we can not do final inspection without core inspection at earlier or same time.Told builder about no listing for audio cabinet and light box. Told to get blanks for lites, strap conduit, address, disposal not wired , ground wire at service shall be strapped
|
ELE05-04207
| Final | 6/5/2006 | 6/6/2006 | 6/6/2006 11:54:08 AM | A | FAIL |
|
|
The pump has been replaced and we are ready for final re-inspection. Contact is Loren @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie called, left message, no correction written, but left message stating no pump there and to call when done
|
ELE06-02057
| Electrical Rough-In | 6/5/2006 | 6/6/2006 | 6/6/2006 10:53:41 AM | A | FAIL |
|
|
WE ARE READY FOR A ROUGH-IN FOR COVER FOR THE THEATER AND EQUIPMENT ROOM. THE PANEL IS NOT READY FOR INSPECTION AT THIS TIME. WE WOULD LIKE TO HAVE THE OK TO COVER IN THE THEATER ROOM WHILE WE COMPLETE THE SUB-PANEL. THE STORE DOES NOT OPEN UNTIL 10:00 AM, YOU CAN ASK FOR GREG NETTLES OR CRAIG ADAMS AT THE STORE.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr, left corr notice, 300.4(A)&(D) edge of holes and cables and raceways shall be 1 1/4" from edge of framing members, 352 & 362 there shall be not more than 4 quarter bends in raceway between pull points,BCC no u/g shall be covered before inspection
|
ELE06-02062
| Rough-In Permanent Service | 6/5/2006 | 6/6/2006 | 6/6/2006 9:59:18 AM | A | PASS |
|
|
Please call if there are any problems ; Phone #: ###-#### Internet Inspection Request from: Kevin Blackmon ric ok, ps u/g n ok
|
ELE06-02063
| Rough-In Permanent Service | 6/5/2006 | 6/6/2006 | 6/6/2006 9:56:28 AM | A | PASS |
|
|
Please call if there are any questions or problems Thanks; Phone #: ###-#### Internet Inspection Request from: Kevin Blackmon ric ok, p/s u/g n ok
|
ELE06-01306
| Final | 6/5/2006 | 6/6/2006 | 6/6/2006 8:51:33 AM | A | FAIL |
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left corr notice, nec 406.5 recpt faceplates shall seat against mounting surface, 210.70(A)(2) there shall be a wall switch at each level for stairs and lights shall work
|
ELE06-02029
| Temporary Service | 6/5/2006 | 6/6/2006 | 6/6/2006 8:20:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 12:59:04 PM. Contact: ###-####. t/s u/g n ok
|
ELE06-02031
| Temporary Service | 6/5/2006 | 6/6/2006 | 6/6/2006 8:18:52 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 1:00:32 PM. Contact: ###-####. t/s u/g n ok
|
ELE06-02030
| Temporary Service | 6/5/2006 | 6/6/2006 | 6/6/2006 8:18:04 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 12:59:42 PM. Contact: ###-####. called contr, left message, nec 110.12(C) there shall be no broken parts(grounded electrode terminal bar)
|
ELE06-02060
| Electrical Rough-In | 6/5/2006 | 6/6/2006 | 6/6/2006 8:13:14 AM | A | PASS |
|
|
###-#### - LLOYD called, left message, ric ok
|