FIR07-00103
| INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/7/2007 10:12:31 AM | P | FAIL |
|
|
Rough Inspection for the 5th floor installation was ok but the plans need to be resubmitted due to riser nipples being added to the gridded system. I also inspected both standpipes except for the roof manifold and the 5th floor riser.
|
FIR06-00602
| INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/7/2007 9:41:50 AM | A | FAIL |
|
|
See mike timmerman's review comments
|
FIR07-00155
| INSP-Supply line flush | 6/5/2007 | 6/6/2007 | 6/6/2007 5:26:48 PM | | DONE |
|
|
See sam rogers inspection review comments for todays date.
|
FIR06-00985
| INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 5:00:42 PM | P | CANC |
|
|
No time for rough-in inspection due to time constraints. Jeff stated he would call it back in.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 6/6/2007 | 6/6/2007 | 6/6/2007 4:58:53 PM | P | PASS |
|
|
See the city approved plans for areas where piping is ok to cover
|
MIS07-00124
| FIR-Final | 6/6/2007 | 6/6/2007 | 6/6/2007 2:44:43 PM | P | FAIL |
|
|
This inspection ended up being a conference since the property manager was unable to test the emergency lights and exit signs. The Right Aid and the Animal Hospital both need sprinkler work done due to overspacing issues. The Optical shop needs exit door hardware addressed. Right Aid has the west front exit blocked with displays and no exit sign as per the approved plans.....ect. This inspection was basically a starting point and not a complete inspection for the owner and I stated this as well. The Right Aid inspection was the only one called in.
|
FIR06-00800
| INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 12:56:40 PM | A | CANC |
|
|
This inspection is being cancelled until forrest is back. Sam rogers contacted the contractor.
|
FIR06-00985
| INSP-Supply line flush | 6/5/2007 | 6/6/2007 | 6/6/2007 12:49:45 PM | P | PASS |
|
|
UG flush passed
|
FIR07-00102
| INSP-Sprinkler Rough-in/Hydro | 6/5/2007 | 6/6/2007 | 6/6/2007 12:36:36 PM | P | PASS |
|
|
Underground hydro test passed.
|
FIR06-00007
| INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 12:33:36 PM | A | CANC |
|
|
Forrest, pls call when on your way. JB needs about a 30 min notice. Phone #: ###-#### Internet Inspection Request from: Rob Puckett Inspection cancelled from web by: Rob Puckett
|
BLD07-00535
| FIRE-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 12:32:15 PM | A | FAIL |
|
|
Provide correct door hardware from the warehouse that allows free passage as discussed
|
BLD07-01201
| FIRE-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 9:55:01 AM | A | PART |
|
|
Todays inspection was only for the 10488 address. Insulation backing appeared to be mounted ok.
|
FIR07-00352
| INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 9:52:42 AM | A | PASS |
|
|
Previous inspection gave ok to cover.
|
FIR07-00393
| INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 9:51:54 AM | A | PASS |
|
|
Full height wall has been removed. Ok to cover.
|
FIR07-00397
| INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 9:48:00 AM | A | PASS |
|
|
Corrections have been made. Ok to cover.
|
FIR07-00311
| INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 9:46:56 AM | A | FAIL |
|
|
Did not do a final inspection because a rough-in has not been done and there are no approved plans on site. I contacted Ron with Viking and let him know this.
|
FIR07-00438
| INSP-Final Inspection | 6/5/2007 | 6/6/2007 | 6/6/2007 8:32:34 AM | A | PASS |
|
|
permit finaled
|