Inspections for the day of: Friday, June 6, 2008.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01967 Aging Inspection6/6/20086/6/20086/12/2008 10:04:09 AM PASS
Sub division stil has lot that have not been built on yet. Drains are protected and project area is kept up and clean.
CAS#460
ESC05-02011 Aging Inspection6/6/20086/6/20086/12/2008 8:23:56 AM FAIL
this lot is still in foundation phase of construction.
CAS
#460
ESC08-00382 Site Final6/6/20086/6/20086/6/2008 4:37:47 PMPPASS
All demo work is complete and parking lot will be starting within 30 days.
CAS
#460
ESC08-00381 Site Final6/6/20086/6/20086/6/2008 4:37:17 PMPPASS
All demo work is complete and parking lot will be starting within 30 days.
CAS
#460
ESC08-00380 Site Final6/6/20086/6/20086/6/2008 4:36:48 PMPPASS
All demo work is complete and parking lot will be starting within 30 days.
CAS
#460
ESC08-00401 Random Inspection6/6/20086/6/20086/6/2008 3:41:27 PMPFAIL
Will be meeting with RP over issue on project.
CAS#460
ESC08-00196 Random Inspection6/6/20086/6/20086/6/2008 3:40:40 PMPFAIL
Will be meeting with RP over issue on project.
CAS#460
ESC08-00202 Random Inspection6/6/20086/6/20086/6/2008 3:08:15 PMPPASS
Site looks good.
ESC08-00039 Tracking Control6/5/20086/6/20086/6/2008 3:07:01 PMPPASS
Street and sidewalk have been cleaned up.
CAS#460
ESC08-00197 Tracking Control6/5/20086/6/20086/6/2008 3:06:42 PMPPASS
Street and sidewalk have been cleaned up.
CAS#460
ESC08-00231 Tracking Control6/5/20086/6/20086/6/2008 3:06:22 PMPPASS
Street and sidewalk have been cleaned up.
CAS#460
ESC05-02010 Site Final6/6/20086/6/20086/6/2008 2:48:49 PMPPASS
Work completed.
CAS
#460
ESC05-02010 Aging Inspection6/6/20086/6/20086/6/2008 2:47:20 PM DEFR
Moved to a site final.
CAS
#460
ESC05-01988 Aging Inspection6/6/20086/6/20086/6/2008 2:18:13 PM PASS
site looks good. Took out the silt fence and replaced it with wattle next to the swale.
CAS
#460
ESC08-00086 General Inspection6/6/20086/6/20086/6/2008 1:12:29 PMPFAIL
Verbal Notice
Need to contain or remove ALL trash debris on project area. Spoke with RP to get this done.
Will re-inspect on 6/11/08 in the AM.
CAS
#460
ESC08-00233 Random Inspection6/6/20086/6/20086/6/2008 11:29:30 AMAFAIL
Need to extend entrance on Findley. Also need to install an entrance off of Federal way. Silt fence on Federal Way needs to be re-installed. Will re-inspect on 6/11/08
CAS
#460
ESC08-00178 Tracking Control6/5/20086/6/20086/6/2008 10:41:18 AMPPART
Cleaned up tracking from yesterday. Minor tracking is occuring today also. They will be sweeping up in the PM today. And Monday they will be installing there construction entrance. Will re-inspect in the PM on 6/9/08.
CAS
#460
ESC06-00711 Tracking Control6/6/20086/6/20086/6/2008 9:21:11 AMAFAIL
Verbal notice.
Clean up all tracking and sediment on the parking lot area coming from the lot to the east of the sub division. Also need to protect the storm drain inlet inside the parking lot.
Discussed with rp over the pertaining issues. Will re-inspect on 6/9/08 in the AM.
CAS #460
ESC08-00252 BMP Violation6/2/20086/6/20086/6/2008 8:58:33 AMAPART
In the process of re-installing the silt fence correctly.
CAS
#460
ESC07-01520 BMP Violation6/3/20086/6/20086/6/2008 8:56:27 AMAFAIL
Silt fence has been takenn down but will be re-installed correctly once they start to stock pile dirt next to the North end chain link fence.
CAS
#460
ESC05-01941 Site Final6/6/20086/6/20086/6/2008 8:10:48 AMAPASS
All work has been completed.
CAS
#460
ESC05-01940 Site Final6/6/20086/6/20086/6/2008 8:10:25 AMAPASS
All work has been completed.
CAS
#460
ESC05-01942 Site Final6/6/20086/6/20086/6/2008 8:10:00 AMPPASS
All work has been completed.
CAS
#460
ESC08-00039 Tracking Control6/5/20086/6/20086/5/2008 3:36:22 PMPCANC
Duplicate