Inspections for the day of: Monday, June 6, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-01277 ELE-Aging Inspection6/6/20116/6/20116/7/2011 7:31:22 AM DONE
still under construction
ELE11-01154 Electrical Rough-In6/6/20116/6/20116/6/2011 3:04:21 PMPPASS
Please call Jeff if you have any questions. Thanks Phone #: ###-#### >> Inspection requested via web by Brandon Blackham ri ok
ELE11-00719 Final6/6/20116/6/20116/6/2011 2:53:45 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Tracy Robertson ok to final
ELE11-01109 Conference6/6/20116/6/20116/6/2011 2:22:54 PMPDONE
Jack-Please call at least 30 mins prior to inspection Phone #: ###-#### talked about wiring for greenhouse, gfci, u/g, disconnect
ELE11-01161 Rough-In Permanent Service6/6/20116/6/20116/6/2011 1:08:00 PMPCANC
They will be there today Phone #: ###-#### >> Inspection requested via web by Stan Woodward see ri
ELE11-01161 Final6/6/20116/6/20116/6/2011 1:07:42 PMPPASS
They will be there today Phone #: ###-#### >> Inspection requested via web by Stan Woodward ok final
ELE11-01161 Electrical Rough-In6/6/20116/6/20116/6/2011 1:06:20 PMPPASS
They will be there today Phone #: ###-#### >> Inspection requested via web by Stan Woodward ri ok
ELE11-01158 Permanent Service6/6/20116/6/20116/6/2011 12:39:48 PMPFAIL
Key to front door under a piece of Slate on the right hand side. reconnect inspection for idaho power - power off for a year. >> Inspection requested via web by Dave Koeppen called, apparently electrican has not been to job, told office would list violations on-line, BCC shall bring service up to code, shall provide grounding at incoming water pipe within 5' of entering structure,augment with 2 ground rods, provide abrasion protection for conductors entering enclosure, isolate neutral and ground at sub-panel,shall use 4 wires, shall provide range and dryer with 4-wire, and receptacles, shall provide correct panel schedule, water heater disconnect, fee due
ELE11-01136 Rough-In Permanent Service6/6/20116/6/20116/6/2011 10:32:47 AMAPASS
Call Dene with any questions

Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser ri ok, p/s u/g n ok
ELE11-01146 Temporary Service6/3/20116/6/20116/6/2011 10:07:19 AMAPASS
NEIL Phone #: ###-#### t/s u/g n ok
ESC11-00213 General Inspection6/6/20116/6/20116/6/2011 9:10:13 AMAFAIL
called rp, told to clean curbing, street, talked to 460 about job
ELE11-01079 Electrical Rough-In6/3/20116/6/20116/6/2011 9:05:08 AMAPASS
John Phone #: ###-#### ri ok, advised to clean up street for erosion control
ELE11-00920 Final6/5/20116/6/20116/6/2011 8:37:00 AMAPASS
Please call 30 minutes prior. Phone #: ###-#### >> Inspection requested via web by John VanZandt ok final
ELE11-00521 Final6/3/20116/6/20116/6/2011 8:26:44 AMAPASS
Mike. Call prior to heading to site. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy corrections made, no card, ok final
ELE08-02423 Electrical Rough-In6/3/20116/6/20116/6/2011 7:51:22 AMANR
jason - first floor conference rooms Phone #: ###-#### called in before electrician ready