BLD10-01036
| FIRE-Sprinkler Rough-in | 6/6/2011 | 6/6/2011 | 6/6/2011 5:13:21 PM | P | PART |
|
|
UG fire supply line okayed for bury.
|
FIR10-00137
| INSP-Conference | 6/6/2011 | 6/6/2011 | 6/6/2011 5:11:07 PM | P | DONE |
|
|
Regarding inspection schedule.
|
FIR11-00203
| INSP-Sprinkler Rough-in/Hydro | 6/6/2011 | 6/6/2011 | 6/6/2011 5:08:26 PM | P | PART |
|
|
Overhead work approved for cover.
|
BLD11-00544
| FIRE-Sprinkler Rough-in | 6/3/2011 | 6/6/2011 | 6/6/2011 2:06:51 PM | A | PART |
|
|
Preliminary overhead inspection for fire sprinkler work at the new server room double interlock preaction system. Discussed plan review schedule, hydrostatic testing, heat at the riser room, seismic issues, as-builts for field mods, system impairments, cover inspections, etc.
|
BLD11-00156
| FIRE-Final Inspection | 6/6/2011 | 6/6/2011 | 6/6/2011 2:02:11 PM | A | FAIL |
|
|
Provide one additonal PFE at the basement level per red-line annotations, remove surface mounted locking hardware at the main entry/exit door, missing hand rail at the stairway, relocate main level fire extinguisher as discussed.
|
BLD11-01111
| FIRE-Final Inspection | 6/6/2011 | 6/6/2011 | 6/6/2011 1:55:37 PM | A | PASS |
|
|
Correction items field verified for completion. Life safety passed.
|