ESC11-00156
| Aging Inspection | 6/6/2012 | 6/6/2012 | 6/8/2012 4:55:23 PM | | PASS |
|
|
drove by site..work hasn't started yet
|
MEC12-01511
| Conference | 6/6/2012 | 6/6/2012 | 6/6/2012 4:50:35 PM | P | PEND |
|
|
Contact Ryan with any questions. We are requesting a look at the Height of the mantel.. Thank you Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...this should have scheduled for thurs am...i rescheduled this
|
MEC12-01783
| Final | 6/6/2012 | 6/6/2012 | 6/6/2012 4:48:07 PM | P | PASS |
|
|
As early as possible please. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MIS12-00039
| MEC-Final | 6/5/2012 | 6/6/2012 | 6/6/2012 4:47:50 PM | A | NH |
|
|
after lunch run...brian was in caldwell and unable to meet, so i rescheduled for thurs pm
|
MEC12-01750
| Final | 6/1/2012 | 6/6/2012 | 6/6/2012 4:04:30 PM | P | PASS |
|
|
Please call Justin to coordinate time for inspection Phone #: ###-#### >> Inspection requested via web by Tom Soniville
|
ESC11-00786
| Site Final | 6/6/2012 | 6/6/2012 | 6/6/2012 3:25:26 PM | P | PASS |
|
|
site clean and finaled
|
MEC12-00034
| Mec-Aging Inspection | 6/6/2012 | 6/6/2012 | 6/6/2012 3:20:40 PM | | FAIL |
|
|
called diane about needing to call for reinspection and corrections done...she will check on it and call me back
|
MEC12-01772
| Pressure Test | 6/5/2012 | 6/6/2012 | 6/6/2012 3:09:27 PM | P | NR |
|
|
Mike Phone #: ###-####....tried calling mike several times....left a notice on the door
|
MEC12-01694
| Final | 6/5/2012 | 6/6/2012 | 6/6/2012 2:39:54 PM | P | PASS |
|
|
in the PM, please do the final any questions contact Travis Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
MEC12-01768
| Rough-in | 6/6/2012 | 6/6/2012 | 6/6/2012 2:23:08 PM | P | PASS |
|
|
Pressure test also please-Ollie Phone #: ###-####...2 duct blaster ok...r/i and 20lb gas ok
|
MEC12-01789
| Rough-in | 6/6/2012 | 6/6/2012 | 6/6/2012 1:55:06 PM | P | PASS |
|
|
r/i mike.............ok for cover
|
MEC12-01789
| Conference | 6/6/2012 | 6/6/2012 | 6/6/2012 1:54:50 PM | P | PASS |
|
|
meet mike 1:30 ###-####...met with mike to discuss clearances around f/p
|
MEC12-01779
| Pressure Test | 6/5/2012 | 6/6/2012 | 6/6/2012 12:03:21 PM | P | FAIL |
|
|
Pressure test on gas line to new pool. Phone #: ###-#### >> Inspection requested via web by Rick Montgomery....bad guage
|
MEC12-01327
| Final | 6/5/2012 | 6/6/2012 | 6/6/2012 12:02:55 PM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino...air balance ok...door locked to inside house
|
MEC12-01505
| Rough-in | 6/5/2012 | 6/6/2012 | 6/6/2012 10:51:50 AM | A | PART |
|
|
Cover - rough Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen...ok to cover lids in restrooms (3)
|
MEC12-01789
| Rough-in | 6/5/2012 | 6/6/2012 | 6/6/2012 10:29:29 AM | A | FAIL |
|
|
call for questions. Fireplace flue has been run thru a chase with manufacture requirements for clearances. Phone #: ###-#### >> Inspection requested via web by Mike Almanza...have installer meet me on site
|
MEC12-01771
| Pressure Test | 6/5/2012 | 6/6/2012 | 6/6/2012 9:03:11 AM | A | PASS |
|
|
gas only....20lb gas ok
|
MEC12-01784
| Conference | 6/5/2012 | 6/6/2012 | 6/6/2012 9:02:48 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Almanza...this should have been a r/i
|