FIR14-00223
| INSP-Final Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 4:34:17 PM | P | PASS |
|
|
Scope of fire sprinkler permit work passed final walkthrough.
|
FIR14-00315
| INSP-Sprinkler Rough-in | 6/5/2014 | 6/6/2014 | 6/6/2014 4:33:15 PM | P | NR |
|
|
To be rescheduled per contractor.
|
FIR14-00171
| INSP-Final Inspection | 6/5/2014 | 6/6/2014 | 6/6/2014 4:30:59 PM | P | PART |
|
|
Four of six hoods need electrical shunt, discussed relocation of the manual pull station and locations for K class extinguishers.
|
FIR14-00219
| INSP-Final Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 2:25:37 PM | P | PART |
|
|
Notification appliances tested satisfactory. Final pending relay to mag lock at exit door NW side.
|
FIR13-00731
| INSP-Final Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 2:17:35 PM | P | PASS |
|
|
Fire sprinkler work passed rough-in and final inspections.
|
FIR14-00321
| INSP-Final Inspection | 6/5/2014 | 6/6/2014 | 6/6/2014 12:21:31 PM | A | PASS |
|
|
Fire alarm work completed satisfactory. Permit finaled.
|
FIR14-00326
| INSP-Final Inspection | 6/5/2014 | 6/6/2014 | 6/6/2014 12:20:20 PM | A | PASS |
|
|
Scope of fire sprinkler work completed and passed inspection.
|
FIR14-00130
| INSP-Sprinkler Rough-in | 6/5/2014 | 6/6/2014 | 6/6/2014 11:27:35 AM | A | PART |
|
|
Okay to cover overhead work at the grid ceiling areas tenant space 1st floor northwest (Beehive).
|
BLD13-01788
| FIRE-Final Inspection | 6/5/2014 | 6/6/2014 | 6/6/2014 12:00:00 AM | A | CANC |
|
|
Bill Tonklin Phone #: ###-####
|