ESC13-01040
| General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 3:14:09 PM | | PASS |
|
|
WIP. No violations. Somerset Village in good condition at time of construction.
|
ESC14-00075
| General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 12:34:46 PM | | PART |
|
|
East side parking lot needs sweeping. WIP inside the Nat. Exterior work is complete.
|
ESC14-00081
| General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 12:28:05 PM | | PASS |
|
|
No violations. Surrounded by vegetative buffer that has been carefully maintained. Culdesac is clean.
|
ESC13-01112
| Site Preparation | 6/6/2014 | 6/6/2014 | 6/6/2014 12:05:01 PM | P | PASS |
|
|
Austin Phone #: ###-####
Permit and address posted on street. Area that was formerly washout has been cleaned, debris/concrete waste removed, and regraded. New washout provided on other Hunter/K&H block.
Approved.
|
ESC13-00991
| Aging Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 12:01:40 PM | | PASS |
|
|
Finaled.
|
ESC13-00991
| DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 12:01:28 PM | P | PASS |
|
|
House complete, landscaped, and occupied. ESC conditions satisfied.
|
ESC13-00480
| General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 10:29:36 AM | | PASS |
|
|
Finaled.
|
ESC13-00480
| DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 10:29:17 AM | P | PASS |
|
|
Union Square building #12 is complete and occupied. The phase II parking lots and common areas are complete and landscaped. Staging area across Smoke Ranch has been dismantled and returned to pre-existing conditions. ESC conditions satisfied.
|
ESC14-00172
| DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 10:13:18 AM | P | PASS |
|
|
Staging area and washout cleaned. Lot regraded and parts of lot have naturally revegetated. No futher ESC inspections required.
|
ESC13-01045
| Aging Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 10:11:50 AM | | PASS |
|
|
Finaled.
|
ESC13-01045
| DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 10:11:32 AM | P | PASS |
|
|
House complete and landscaped. Contractor did comply by pulling permit ESC14-00172 for staging area. This area has been cleanerd, regraded and has started to vegetate.
ESC conditions satisfied.
|
ESC14-00165
| DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 9:22:45 AM | P | PASS |
|
|
|
ESC14-00165
| Site Final | 6/6/2014 | 6/6/2014 | 6/6/2014 9:22:22 AM | P | PASS |
|
|
Project is complete and exterior disturbance for new utility is repaved. ESC conditons satisfied.
|
ESC12-00364
| General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 8:50:30 AM | | PASS |
|
|
Near completion. Not yet full landscaped around back and to the west.
|