ELE16-01760
| Rough-In Permanent Service | 6/2/2016 | 6/6/2016 | 6/7/2016 12:23:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Rough in ok to cover p/s u/g n ok
|
ELE16-01747
| Final | 6/5/2016 | 6/6/2016 | 6/6/2016 3:36:47 PM | P | FAIL |
|
|
Can we please have the inspection as late in the day as possible? Between 4-5 would be best. Please call 30minutes prior to. ###-#### Phone #: ###-#### Inspection requested via web by seth ogle 200.6 (B) Identification of grounded conductor White marking at all terminals. Remove Bare ground wire from meter base.
|
ELE16-01780
| Temporary Service | 6/6/2016 | 6/6/2016 | 6/6/2016 2:51:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI t/s u/g n ok
|
ELE16-01129
| Final | 6/6/2016 | 6/6/2016 | 6/6/2016 2:25:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman FInal ok
|
ELE16-01609
| Final | 6/6/2016 | 6/6/2016 | 6/6/2016 2:10:23 PM | P | PASS |
|
|
Casey will call to schedule time to meet you onsite. I am out of town. ###-####. Phone #: ###-#### Inspection requested via web by Matthew Dunay DC voltage side only Final ok
|
ELE15-03729
| Final | 6/6/2016 | 6/6/2016 | 6/6/2016 1:50:33 PM | P | PART |
|
|
Partial Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rooms 108-111 208-211 308-311 Final ok
|
ELE16-01740
| Rough-In Permanent Service | 6/2/2016 | 6/6/2016 | 6/6/2016 1:16:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson rough in ok to cover p/s u/g n ok
|
ELE16-01763
| Permanent Service | 6/2/2016 | 6/6/2016 | 6/6/2016 12:40:33 PM | P | PASS |
|
|
Water lines are all plastic. New ground rods are installed. Ran new circuit to Dryer, and replaced feeder for hot-tub Phone #: ###-#### Inspection requested via web by Troy Cobb p/s u/g rec ok
|
ELE16-01783
| Final | 6/6/2016 | 6/6/2016 | 6/6/2016 12:18:35 PM | P | PASS |
|
|
Deck Builder should be on site, if you have any questions please call me!
Thx, Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Final ok
|
ELE16-01783
| Electrical Rough-In | 6/6/2016 | 6/6/2016 | 6/6/2016 12:18:03 PM | P | PASS |
|
|
Deck Builder should be on site, if you have any questions please call me!
Thx, Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Rough in ok to cover
|
ELE16-01255
| Final | 6/3/2016 | 6/6/2016 | 6/6/2016 10:20:34 AM | A | PASS |
|
|
Please call the homeowner Larry, ###-#### when you are on your way. Thank You Phone #: ###-#### Inspection requested via web by Clay Morgan Final ok
|
ELE16-01645
| Electrical Rough-In | 6/3/2016 | 6/6/2016 | 6/6/2016 10:07:22 AM | A | PASS |
|
|
Call Dan when in route if possible. Phone #: ###-#### Inspection requested via web by Steve McCloy Rooms 105 - 110, Electrical Room, and High wall OK to cover
|
ELE16-01778
| Electrical Rough-In | 6/5/2016 | 6/6/2016 | 6/6/2016 9:17:56 AM | A | PASS |
|
|
Underground circuit extension rough-in for back covered patio area Phone #: ###-#### Inspection requested via web by Jarod Murray Rough in underground only. ok to cover
|
ELE16-01733
| Electrical Rough-In | 6/5/2016 | 6/6/2016 | 6/6/2016 8:57:54 AM | A | PASS |
|
|
Underground inspection prior to foundation being poured Phone #: ###-#### Inspection requested via web by Victoria Craig Rough in underground only ok to cover
|
ELE16-01129
| Final | 6/5/2016 | 6/6/2016 | 6/6/2016 8:34:27 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Not ready. Call back in
|