NAF14-00028
| INSP-Final | 6/6/2016 | 6/6/2016 | 6/6/2016 2:33:42 PM | P | PASS |
|
|
Permit finaled
|
BLD16-00464
| FIRE-Final Inspection | 5/31/2016 | 6/6/2016 | 6/6/2016 1:57:18 PM | A | PASS |
|
|
life safety passed
|
FIR15-00812
| INSP-Sprinkler Rough-in | 6/6/2016 | 6/6/2016 | 6/6/2016 12:54:12 PM | P | FAIL |
|
|
The tenting inspection on Cottage C #1 failed due to tenting not be adequate with arm overs not tented on the second floor and the insulation in many place not secured and just laying on the pipe.
|
BLD15-04512
| FIRE-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 11:28:14 AM | P | PASS |
|
|
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
|
BLD15-03500
| FIRE-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 11:27:29 AM | P | PASS |
|
|
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
|
BLD15-04511
| FIRE-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 11:26:45 AM | P | PASS |
|
|
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
|
FIR15-00812
| INSP-Sprinkler Rough-in | 6/3/2016 | 6/6/2016 | 6/6/2016 8:52:32 AM | A | FAIL |
|
|
The tenting inspection on Cottage C #1 failed due to no tenting being installed
|
FIR15-00822
| INSP-Conference | 6/6/2016 | 6/6/2016 | 6/6/2016 12:00:00 AM | P | DONE |
|
|
“Met Mike Bierman onsite to evaluate pressure at base of riser assembly. Pressure gauge indicated 73psi on one riser gauge and 78 psi on the other riser pressure gauge. We agreed to check the pressure once again the following morning to verify that the minimum require base of riser (BOR) pressure is accurate per system design. Final sign off can occur with this follow up pending verification.”
|