Inspections for the day of: Monday, June 6, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF14-00028 INSP-Final6/6/20166/6/20166/6/2016 2:33:42 PMPPASS
Permit finaled
BLD16-00464 FIRE-Final Inspection5/31/20166/6/20166/6/2016 1:57:18 PMAPASS
life safety passed
FIR15-00812 INSP-Sprinkler Rough-in6/6/20166/6/20166/6/2016 12:54:12 PMPFAIL
The tenting inspection on Cottage C #1 failed due to tenting not be adequate with arm overs not tented on the second floor and the insulation in many place not secured and just laying on the pipe.
BLD15-04512 FIRE-Final Inspection6/6/20166/6/20166/6/2016 11:28:14 AMPPASS
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
BLD15-03500 FIRE-Final Inspection6/6/20166/6/20166/6/2016 11:27:29 AMPPASS
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
BLD15-04511 FIRE-Final Inspection6/6/20166/6/20166/6/2016 11:26:45 AMPPASS
Life safety passed. Contractor to provide address numbers facing the street, as discussed, prior to a building inspection.
FIR15-00812 INSP-Sprinkler Rough-in6/3/20166/6/20166/6/2016 8:52:32 AMAFAIL
The tenting inspection on Cottage C #1 failed due to no tenting being installed
FIR15-00822 INSP-Conference6/6/20166/6/20166/6/2016 12:00:00 AMPDONE
“Met Mike Bierman onsite to evaluate pressure at base of riser assembly. Pressure gauge indicated 73psi on one riser gauge and 78 psi on the other riser pressure gauge. We agreed to check the pressure once again the following morning to verify that the minimum require base of riser (BOR) pressure is accurate per system design. Final sign off can occur with this follow up pending verification.”