FIR15-00876
| INSP-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 3:03:37 PM | P | PASS |
|
|
Hydrostatic test was completed before final inspection under this inspection request. Final fire sprinkler inspection passed/complete.
|
FIR16-00008
| INSP-Sprinkler Rough-in | 6/6/2016 | 6/6/2016 | 6/6/2016 1:24:32 PM | P | CANC |
|
|
Inspection request rescheduled for June 7th AM
|
FIR16-00290
| INSP-Final Inspection | 6/3/2016 | 6/6/2016 | 6/6/2016 10:22:24 AM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete.
|
BLD16-01034
| FIRE-Final Inspection | 6/2/2016 | 6/6/2016 | 6/6/2016 10:05:07 AM | A | PART |
|
|
Per conversation with point of contact Keith, phone ###-####, project is being completed in two phases, area considered phase one for area of work is the west side, no fire sprinkler modifications, no fire alarm modifications, fire extinguisher located by the elevator with a current inspection tag, final life fire safety inspection passed/complete for phase one. Phase two for this area or work is the east side of space, this area to be completed at later date.
|
BLD16-00608
| FIRE-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 9:38:46 AM | P | PASS |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
|
FIR16-00342
| INSP-Final Inspection | 6/3/2016 | 6/6/2016 | 6/6/2016 9:35:01 AM | A | PASS |
|
|
Final fire alarm inspection passed/complete.
|