BLD16-03984
| BLD-Final | 6/6/2017 | 6/6/2017 | 6/6/2017 4:12:38 PM | P | FAIL |
|
|
Thanks Phone #: ###-#### Inspection requested via web by Matt Greenman handrail to be nose to nose of run of stairs
|
BLD16-03352
| BLD-Final | 6/5/2017 | 6/6/2017 | 6/6/2017 3:25:38 PM | P | NR |
|
|
John Phone #: ###-#### need hvac
|
BLD17-00109
| BLD-Final | 6/5/2017 | 6/6/2017 | 6/6/2017 3:10:21 PM | P | NR |
|
|
Inspection requested via web by Ryan Lierman open ele and mech
|
BLD17-00492
| BLD-Framing/Rough-in | 6/5/2017 | 6/6/2017 | 6/6/2017 3:04:06 PM | A | PART |
|
|
Jared Phone #: ###-#### c/n truss bissues/ ok to insulate
|
BLD17-00091
| BLD-Conference | 5/25/2017 | 6/6/2017 | 6/6/2017 2:13:19 PM | P | DONE |
|
|
Evan Phone #: ###-####
|
MIS15-00234
| MIS-Aging Inspection | 6/6/2017 | 6/6/2017 | 6/6/2017 12:41:54 PM | | FAIL |
|
|
no word from hot topics team
|
BLD16-03892
| BLD-Framing/Rough-in | 6/5/2017 | 6/6/2017 | 6/6/2017 12:40:58 PM | A | PART |
|
|
Ken-2 hour assemblies Phone #: ###-####air ok center shaft wall ok wip/ north wall of 50 pirlin atchment to studs ok/ elavator walls ok/ south east st ok to complet.
|
BLD17-01556
| BLD-Footing | 6/5/2017 | 6/6/2017 | 6/6/2017 12:00:00 AM | A | CANC |
|
|
Chris Phone #: ###-####
|