ELE16-03914
| Permanent Service | 6/5/2017 | 6/6/2017 | 6/6/2017 12:32:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt p/s u/g rec ok
|
ELE17-01640
| Final | 6/6/2017 | 6/6/2017 | 6/6/2017 12:15:16 PM | P | PASS |
|
|
Brent Phone #: ###-#### Ok final. Talked to Brent, only hooked up power to inside panel. Grounds and nuet seperated
|
ELE17-00695
| Final | 6/6/2017 | 6/6/2017 | 6/6/2017 12:14:23 PM | P | PASS |
|
|
Brent Phone #: ###-#### Ok final. Talked to Brent, only fed power to inside panel. Grounds and neut seperated.
|
ELE17-01557
| Electrical Rough-In | 6/6/2017 | 6/6/2017 | 6/6/2017 11:53:42 AM | P | PASS |
|
|
underground // Ryan Phone #: ###-#### Trench at required depth. Ok to cover.
|
ELE17-01729
| Conference | 6/6/2017 | 6/6/2017 | 6/6/2017 11:41:04 AM | P | DONE |
|
|
Question on grounding. David Forbes ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Discussed EGC from original outside service to new panel install inside.
|
ELE17-00721
| Final | 6/6/2017 | 6/6/2017 | 6/6/2017 10:43:21 AM | P | PASS |
|
|
Please call ahead for access - Adam Phone #: ###-#### Ok final
|
ELE17-01722
| Temporary Service | 6/5/2017 | 6/6/2017 | 6/6/2017 9:35:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman t/s u/g n ok
|
ELE17-00029
| Final | 6/3/2017 | 6/6/2017 | 6/6/2017 9:35:40 AM | A | PASS |
|
|
garage code 0713 Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok final
|
ELE17-00949
| Final | 6/5/2017 | 6/6/2017 | 6/6/2017 9:07:13 AM | A | PASS |
|
|
Von is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok final
|