ELE18-00900
| Electrical Rough-In | 6/6/2018 | 6/6/2018 | 6/6/2018 2:19:25 PM | P | NH |
|
|
This Inspection will be for the underground leading into the building from the pool. Thank you. Phone #: ###-#### Inspection requested via web by Craig Korell All gates locked contact unable to reach responcible party for access. Will recall
|
ELE17-01337
| Electrical Rough-In | 6/5/2018 | 6/6/2018 | 6/6/2018 1:33:51 PM | P | PASS |
|
|
Requesting rough inspection of the bar area Phone #: ###-#### Inspection requested via web by Clint Tate Bar wall rough in ok cover
|
ELE18-01907
| Rough-In Permanent Service | 6/4/2018 | 6/6/2018 | 6/6/2018 10:56:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Rough in ok cover p/s u/g n ok
|
ELE18-01936
| Temporary Service | 6/6/2018 | 6/6/2018 | 6/6/2018 10:50:51 AM | P | FAIL |
|
|
Temp service energized. Stopped to check GFCI protection. 590.6(B)- Receptacles other than 120 volt used for temp power shall have GFCI protection. 250 did not trip when tested.
|
ELE18-02011
| Electrical Rough-In | 6/5/2018 | 6/6/2018 | 6/6/2018 10:12:43 AM | A | PASS |
|
|
Please call Lynn prior to arrival. Phone #: ###-#### Inspection requested via web by Lynn Proctor Wall rough in ok cover
|
ELE17-04193
| Final | 6/5/2018 | 6/6/2018 | 6/6/2018 9:52:02 AM | A | PASS |
|
|
Matt. Call prior to heading to site. Phone #: ###-#### Inspection requested via web by Sean DeLacy No Card posted. Final ok
|
ELE18-01470
| Final | 6/5/2018 | 6/6/2018 | 6/6/2018 9:17:46 AM | A | PART |
|
|
Final For Third 3 Request for TCO Please call Corey Phone #: ###-#### Inspection requested via web by Kevin Perez Level 3 only TCO ok
|
ELE18-01789
| Permanent Service | 6/5/2018 | 6/6/2018 | 6/6/2018 8:37:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Underground being installed at time of inspection. p/s u/g n ok
|
ELE18-02113
| Temporary Service | 6/5/2018 | 6/6/2018 | 6/6/2018 8:07:27 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey 250.24- Service shall have a grounding electrode connected to the grounded conductor. Main bonding jumper needed to complete bonding as per 250.28. Sent a picture message to contact
|