Inspections for the day of: Thursday, June 6, 2019.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01246 FIRE-Final Inspection6/4/20196/6/20196/6/2019 5:05:08 PMPPART
Final life fire safety inspection for core and shell substantially complete. Radio test for fire department radio coverage did not pass. A TCO is authorized per conversation with Ron Johnson with Boise Fire contingent on radio coverage issue being resloved, all other items for life fire safety have been inspected and passed.

Phone #: ###-#### Inspection requested via web by Sam Reading
FIR18-00967 INSP-Final Inspection6/3/20196/6/20196/6/2019 5:02:27 PMPPART
Final inspection for scope of work has been performed, install is code compliant, permit will remain in issued status until School District AES (FIR18-00344, instructed by Boise Fire to not final any FIR permits associated with addresses that have an open permit for AES) communicator is inspected and passed. After AES is completed then an inspection request will need to be made to final this permit.

Bret Bailey, Dispatcher Phone #: ###-#### Inspection requested via web by John Siewert
FIR18-00964 INSP-Sprinkler Rough-in6/4/20196/6/20196/6/2019 4:44:49 PMPDONE
Fire pump commissioning complete.

Fire pump start up test. Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
BLD19-00483 FIRE-Final Inspection6/5/20196/6/20196/6/2019 4:43:01 PMAFAIL
Fire alarm contractor did not request an inspection, project associated FIR permits need to be finaled before life fire safety can be performed.

To coincide with Alarm test scheduled by Johnson Controls/TYCO. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
FIR19-00303 INSP-Supply line flush6/5/20196/6/20196/6/2019 11:03:46 AMADONE
Underground main line flush complete.

Schedule with Troy for time to meet with Suez. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
FIR19-00217 INSP-Final Inspection6/5/20196/6/20196/6/2019 9:56:47 AMACANC
Due to inspection timing inspection request will be rescheduled for a later date. This request cancelled per conversation with point of contact.

before 11 // Drew Phone #: ###-####
BLD18-03833 FIRE-Final Inspection6/6/20196/6/20196/6/2019 9:55:59 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

FIR19-00366 INSP-Final Inspection6/5/20196/6/20196/6/2019 9:54:55 AMAPASS
Final fire alarm inspection for scope of work complete.

Call prior to going Phone #: 2089853303 >> Inspection requested via mobile web by Mike Kroll
FIR18-00856 INSP-Final Inspection6/5/20196/6/20196/6/2019 9:54:05 AMAPART
Final inspection for scope of work has been performed, install is code compliant, permit will remain in issued status until School District AES (FIR18-00225, instructed by Boise Fire to not final any FIR permits associated with addresses that have an open permit for AES) communicator is inspected and passed. After AES is completed then an inspection request will need to be made to final this permit.Please call Clarence a couple of hours before heading out. No one is on site.

Thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell