BLD19-02049
| BLD-Other | 6/6/2019 | 6/6/2019 | 6/6/2019 4:58:25 PM | P | PASS |
|
|
Daniel-block and tie Phone #: ###-####
|
BLD19-02046
| BLD-Other | 6/6/2019 | 6/6/2019 | 6/6/2019 4:58:17 PM | P | PASS |
|
|
Daniel-block and tie Phone #: ###-####
|
BLD19-01985
| BLD-Framing/Rough-in | 6/6/2019 | 6/6/2019 | 6/6/2019 4:58:07 PM | P | PASS |
|
|
OK to cover...
|
BLD18-03116
| BLD-Energy code compliance | 6/6/2019 | 6/6/2019 | 6/6/2019 4:57:51 PM | P | PASS |
|
|
|
BLD19-00485
| BLD-Wall Bracing | 6/5/2019 | 6/6/2019 | 6/6/2019 4:57:24 PM | A | PEND |
|
|
Renail edge and field nailing as per plans...
|
BLD18-00550
| BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 4:56:34 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD18-00550
| DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 4:56:26 PM | P | PASS |
|
|
|
BLD18-00550
| BLD-Blower Door Test Results | 6/5/2019 | 6/6/2019 | 6/6/2019 4:56:20 PM | A | DONE |
|
|
ACH50- 4.18
|
BLD19-01803
| BLD-Framing/Rough-in | 6/5/2019 | 6/6/2019 | 6/6/2019 4:56:04 PM | A | NR |
|
|
Need trades rough-in...
|
BLD19-00716
| BLD-Energy code compliance | 6/6/2019 | 6/6/2019 | 6/6/2019 4:55:19 PM | A | PEND |
|
|
Pending truss approved fix...
|
BLD18-01231
| BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 10:15:21 AM | A | PASS |
|
|
Re-inspection for final for C of O Original final inspection done by Dave Hannah Branden out Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD18-01231
| DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 10:15:14 AM | P | PASS |
|
|
|