BLD01-00579
| BLD-Aging Inspection | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | | FAIL |
|
|
permit states: "to wire..." no call 6/7/2001 10:08:07 AM
|
BLD01-00577
| BLD-Aging Inspection | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | | FAIL |
|
|
no call... 6/7/2001 10:10:52 AM
|
BLD01-00576
| BLD-Aging Inspection | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | | FAIL |
|
|
no call 6/7/2001 10:03:33 AM
|
BLD01-00580
| BLD-Aging Inspection | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | | FAIL |
|
|
no call...some shingles lifted or torn. 6/7/2001 10:09:58 AM
|
BLD98-03661
| BLD-Final | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00625
| BLD-Energy code compliance | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | FAIL |
|
|
###-####; c/n, firewall,need energy path & plans, etc 6/7/2001 9:53:37 AM
|
BLD01-00626
| BLD-Energy code compliance | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | FAIL |
|
|
###-####; c/n issued: firestops, gypsum backing, nailing 6/7/2001 9:39:43 AM 6/7/2001 9:41:11 AM
|
BLD01-00011
| BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 6/7/2001 10:29:14 AM w/ bldr...watch adjacent fdn; concrete to be called for inspection....concrete only permit as per Mike P. 6/7/2001 10:41:19 AM
|
BLD98-03661
| BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 6/7/2001 8:34:40 AM ok to delete panic at activity rm... floor area is marginal & largely occupied by semi-fixed tables; consulted w/ Mike Otto. Also rec'd eng's & spec. insps reports ok. 6/7/2001 8:35:15 AM
|
BLD01-00508
| BLD-Framing/Rough-in | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PART |
|
|
shear nail Gail ###-####, nail straps.at front 6/7/2001 1:50:45 PM 6/7/2001 1:51:10 PM
|
BLD01-00902
| BLD-Wall cover | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 09:10:51. Contact: ###-####...complete insul 6/7/2001 2:09:32 PM l 6/7/2001 2:09:36 PM 6/7/2001 2:09:53 PM
|
BLD00-03519
| BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/7/2001 1:49:28 PM met w/ bldr onsite, need eng's report
|
BLD00-03538
| BLD-Concrete | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 6/7/2001 4:36:37 PM pt deck, need 2nd mat steel, wip
|
BLD99-03383
| BLD-Framing/Rough-in | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 6/7/2001 4:39:19 PM ext gfrc panels
|
BLD00-02242
| BLD-Framing/Rough-in | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PART |
|
|
Rick ###-####; shaft & duct enclosure at west stair ok to continue. 2nd fl framing at east portion ok... 6/7/2001 3:05:25 PM
|
BLD01-00562
| BLD-Footing | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PART |
|
|
###-#### travis ft
|