Inspections for the day of: Thursday, June 7, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01852 Sprinkler (Final)6/6/20016/7/20016/7/2001 12:00:00 AMAPASS
###-####
PLM01-01854 Water and/or Sewer6/6/20016/7/20016/7/2001 12:00:00 AMAPASS
###-#### 2 water line only duplex
PLM01-01480 Plumbing Rough-in6/6/20016/7/20016/7/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/06/2001 at 19:20:20. Contact: ###-####. moved sink drain and water to new location ok to cover. 6/7/2001 9:32:26 AM
PLM01-01094 Final6/7/20016/7/20016/7/2001 12:00:00 AMAPASS
Scheduled by Inspector: 360 On 6/7/2001 11:15:19 AM
PLM01-01831 Sprinkler (Final)6/7/20016/7/20016/7/2001 12:00:00 AMPPART
Walter ###-#### tie in ok ok to backfill pvb needs to be tested and ceritified. left message on answer machine 6/7/2001 2:29:03 PM
PLM01-01858 Water and/or Sewer6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 6/7/2001 1:37:26 PM
PLM01-01859 Water and/or Sewer6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
###-#### w/s final
PLM01-01862 Sprinkler (Final)6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
spr bill - ###-####
PLM01-01863 Water and/or Sewer6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
###-#### w/s final
PLM01-01606 Groundwork6/7/20016/7/20016/7/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/07/2001 at 08:55:28. Contact: ###-####. groundwork in area D bakery and two small section's in area C ok to cover. 6/7/2001 3:45:57 PM
PLM01-00567 Final6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 09:43:30. Contact: ###-####.
PLM01-01779 Plumbing Rough-in6/7/20016/7/20016/7/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 10:31:50. Contact: ###-####.