Inspections for the day of: Thursday, June 7, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02929 FIRE-Conference6/6/20016/7/20016/7/2001 12:00:00 AMACANC
Cancel To be rescheduled for 6/8/01 6/7/2001 3:50:50 PM
FIR01-00085 INSP-Supply line flush6/6/20016/7/20016/7/2001 12:00:00 AMAPART
OK on supply line flush 6/7/2001 11:04:52 AM
BLD01-00434 FIRE-Final Inspection6/6/20016/7/20016/7/2001 12:00:00 AMPNR
Not ready for Reinsp Rack storage issue not yet resolved 6/7/2001 3:32:14 PM
FIR01-00122 INSP-Sprinkler Rough-in/Hydro6/7/20016/7/20016/7/2001 12:00:00 AMPPART
Spklr rough in Add 2 heads and recalc 3 lines or heads off wall above stairs 6/7/2001 2:07:29 PM
BLD01-00728 FIRE-Final Inspection6/7/20016/7/20016/7/2001 12:00:00 AMPFAIL
Final Fail C/N issued 6/7/2001 3:13:48 PM
BLD01-00714 FIRE-Alarm Testing5/31/20016/7/20016/7/2001 12:00:00 AMPPASS
Final OK for certificate of compliance 6/7/2001 6:30:35 PM
FIR01-00149 INSP-Supply line flush6/6/20016/7/20016/7/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 06/06/2001 at 08:17:46. Contact: ###-####.----cancel per shilo
FIR01-00149 INSP-Supply line flush6/6/20016/7/20016/7/2001 12:00:00 AMPCANC
Cancel water not turned yet 6/7/2001 2:10:43 PM