MEC01-01661
| Rough-in | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 12:24:36. Contact: ###-####.
|
BLD01-01351
| BLD-Foundation | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PART |
|
|
James ###-#### wip 6/7/2001 10:32:17 AM
|
MEC01-01675
| Pressure Test | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
debbie ###-#### pres test
|
MEC01-01425
| Rough-in | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 15:54:22. Contact: ###-####.
|
MEC01-01425
| Pressure Test | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 15:54:49. Contact: ###-####.
|
BLD01-00994
| BLD-Other | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 06:17:12. Contact: . C/N jposted--ok to side bottom floor only, top floor needs shear panels, blocks, nails. 6/7/2001 8:36:26 AM
|
BLD01-00657
| BLD-Wall cover | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 07:20:40. Contact: . C/N issued-Do Not Cover 6/7/2001 8:42:03 AM
|
BLD01-00897
| BLD-Energy code compliance | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 08:49:42. Contact: ###-####.
|
BLD01-00657
| BLD-Wall cover | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 10:03:23. Contact: .
|
BLD01-00791
| BLD-Framing/Rough-in | 6/7/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | FAIL |
|
|
Terry ###-#### C/N issued 6/7/2001 2:14:11 PM
|
BLD01-00886
| BLD-Energy code compliance | 6/6/2001 | 6/7/2001 | 6/7/2001 12:00:00 AM | P | PASS |
|
|
###-#### Prior c/n items corrected. 6/7/2001 3:05:06 PM
|