PLM02-01609
| Final | 6/4/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
fn insp pam- ###-####
|
PLM02-01646
| Sprinkler (Final) | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### GREG
|
PLM02-01649
| Water and/or Sewer | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PART |
|
|
water line service lines o will see tie ins in valve box later 6/6/2002 2:27:58 PM
|
PLM01-03240
| Groundwork | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PART |
|
|
DONNY ###-#### GRID # G 5,6,7 trench drains 6/7/2002 10:59:45 AM
|
PLM02-01653
| Plumbing Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-02684
| Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:49:06. Contact: ###-####.
|
PLM01-02977
| Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:49:54. Contact: ###-####.
|
PLM02-00239
| Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:50:36. Contact: ###-####.
|
PLM02-00340
| Storm Drains | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:57:57. Contact: ###-####.
|
PLM02-00901
| Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 08:40:39. Contact: ###-####. final ok with small leak under lav fixed 6/7/2002 4:22:27 PM
|
PLM02-01659
| Water and/or Sewer | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
WESTON ###-#### water line from well to pump house ok to cover, additional permit required for any additional water piping other than irragation, water piping exposed on the west side of pumphouse must be protected from freezing and sunlight. 6/7/2002 9:30:46 AM
|