BLD01-02677
| BLD-Final | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 11:47:53. Contact: ###-####.
|
BLD02-00945
| BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | FAIL |
|
|
shear- joe ###-#### c/n posted. 6/7/2002 12:27:45 PM
|
BLD02-01009
| BLD-Footing | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### dave
|
MEC02-00960
| Final | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | CANC |
|
|
###-#### garage code 7550. unable to do am inspection this day i have re-called this for a pm. 6/7/2002 12:43:36 PM
|
BLD01-02802
| BLD-Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 06:55:29. Contact: .Loading dock roll down doors needs to be 1 hr rated, the door to stereo shop needs to be a 1 hr rated door, need special inspection final letter of completion. No c/n posted contractor on site notified. 6/7/2002 1:17:32 PM
|
BLD02-00503
| BLD-Final | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:01:35. Contact: ###-####.ok perm oc. 6/7/2002 10:00:51 AM
|
MEC01-02624
| Pressure Test | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PART |
|
|
###-####line from rear of gas range to unit next to office. 6/10/2002 10:20:43 AM
|
BLD02-00484
| BLD-Framing/Rough-in | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
fr ###-####- dennis
|
BLD01-00729
| BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 6/6/2002 3:57:27 PM
|
BLD02-00863
| BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 6/10/2002 10:21:11 AM
|
BLD02-00450
| BLD-Energy code compliance | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 09:40:48. Contact: ###-####.
|