BLD01-02646
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | | NR |
|
|
secondary access still not complete 6/7/2002 1:54:59 PM
|
BLD01-02645
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:53:28 PM
|
FIR02-00010
| INSP-Sprinkler Rough-in | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PASS |
|
|
rough-in for building OK
|
FIR02-00039
| INSP-Sprinkler Rough-in | 6/7/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | PART |
|
|
wet system rough-in ok. Only a small section of the attic dry system was inspected. It had multiple problems so no other areas were looked at. Problems included sprinkler heads spaced too close, heads too far from deck, missing earth quake bracing and head overspaced off of a draft stop and installation of sprinklers in the hydraulic calc area not per plan. I left comment for that area to be resubmitted for Bill Alexanders approval
|
BLD01-02643
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:55:50 PM
|
BLD01-02652
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:56:14 PM
|
BLD01-02644
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:56:55 PM
|
BLD01-02651
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:56:38 PM
|
BLD01-02647
| FIRE-Final Inspection | 6/6/2002 | 6/7/2002 | 6/7/2002 12:00:00 AM | A | NR |
|
|
secondary access still not complete 6/7/2002 1:57:12 PM
|