ELE04-01065
| Final | 6/7/2004 | 6/7/2004 | 6/7/2004 8:53:28 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 7:43:20 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 7 2004 8:53AM.
|
ELE04-00554
| ELE-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | | PART |
|
|
wsuc stopped at job site 6/8/2004 8:17:13 AM
|
ELE04-00555
| ELE-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | | PART |
|
|
wsuc stopped at job site 6/8/2004 8:17:34 AM
|
ELE04-01635
| Rough-In Permanent Service | 6/3/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | PASS |
|
|
###-#### darrel r/i ok p/s o/h new ok 6/7/2004 8:53:58 AM
|
ELE04-01635
| Electrical Rough-In | 6/3/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | DONE |
|
|
###-#### darrel
|
ELE04-01367
| Final | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 6/4/2004 at 2:41:24 PM. Contact: ###-####. needs bi level switching, bond hot and cold at WH, 6/7/2004 10:17:27 AM
|
ELE04-01640
| Final | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | PASS |
|
|
pacific northwest electric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok card signed 6/7/2004 9:34:35 AM
|
ELE04-01286
| Final | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | FAIL |
|
|
KEY ON TOP OF ELECTRICAL BOX, IF DOOR IS LOCKED; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack cor. posted called 314.3 shall install non metallic raceway or bond bushings feeds to sprinkler time clocks 6/7/2004 8:17:21 AM
|
ELE03-02899
| Final | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer at time of final inspection all cords are removed from below ,or passing through floor 6/7/2004 4:23:51 PM
|
ELE04-00623
| Final | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/4/2004 at 3:04:13 PM. Contact: ###-####. ok card signed 6/7/2004 3:30:30 PM
|
ELE04-01663
| Permanent Service | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
dan-- ###-####--call 1st for access
p/s o/h new ok 6/7/2004 2:50:06 PM
|
ELE04-01663
| Final | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | FAIL |
|
|
call 1st for access dan ###-#### cor. posted called 334.15 (B) protect romex, 250.8 no SMS allowed for grd or bond lug on siding, 410.30(C) outlet shall be directly above fixture, 400.8 shall not tiewrap cord to anything also needs power 6/7/2004 2:53:22 PM
|
ELE04-00772
| Electrical Rough-In | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 10:39:16 AM. Contact: ###-####. ceiling ok rest of phase 1 6/7/2004 12:14:46 PM
|
ELE04-01442
| Electrical Rough-In | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PART |
|
|
underground///shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 6/7/2004 12:53:55 PM
|
ELE04-01464
| Electrical Rough-In | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PART |
|
|
conference ok
|