PLM04-01502
| Sprinkler (Final) | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | PASS |
|
|
andrew ###-####
|
PLM04-01503
| Plumbing Rough-in | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | PASS |
|
|
###-#### nell
|
PLM04-01220
| Final | 6/4/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | A | NR |
|
|
Late am please////gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PLM04-01515
| Sprinkler (Final) | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | FAIL |
|
|
###-#### melissa okay to cover, backflow not tested 6/7/2004 2:36:03 PM
|
PLM04-01517
| Water and/or Sewer | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
###-#### dj
|
PLM04-00125
| Final | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 10:24:49 AM. Contact: ###-####.
|
PLM04-01527
| Water and/or Sewer | 6/7/2004 | 6/7/2004 | 6/7/2004 12:00:00 AM | P | PASS |
|
|
###-#### john future line for garage and sprinkler system. told him he needed a permit for the backflow when it is installed 6/7/2004 2:21:47 PM
|