ELE06-01863
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 4:34:29 PM | P | PASS |
|
|
seth - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
ELE06-00981
| Electrical Rough-In | 6/7/2006 | 6/7/2006 | 6/7/2006 3:38:09 PM | P | PASS |
|
|
###-#### - bernie R/I Ok
|
ELE06-02001
| Final | 6/7/2006 | 6/7/2006 | 6/7/2006 3:18:28 PM | P | FAIL |
|
|
Final inspection for air conditioning power. Please inspect after 3:30 p.m. Contacto Loren @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie no recep within 25 ft
|
ELE06-01876
| Final | 6/7/2006 | 6/7/2006 | 6/7/2006 3:05:17 PM | P | NR |
|
|
bob- ###-#### cell remove tile for the length of run and make required corrections straping and covers installed
|
ELE06-02083
| Temporary Service | 6/7/2006 | 6/7/2006 | 6/7/2006 2:14:21 PM | P | FAIL |
|
|
temp power for construction ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely install connector on GEC and uncover ground rod
|
ELE06-02087
| Conference | 6/7/2006 | 6/7/2006 | 6/7/2006 1:41:59 PM | P | PART |
|
|
###-#### - andy Note: as early as possible afternoon talked about knob an d tube and basement remodel
|
ELE06-00722
| Electrical Rough-In | 6/7/2006 | 6/7/2006 | 6/7/2006 1:05:12 PM | P | PART |
|
|
###-####. Scheduled by a contractor via Hello! on 6/7/2006 at 7:22:57 AM. Contact: ###-####. walls ANOP
|
ELE06-02079
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 11:24:50 AM | A | PART |
|
|
underground only//john ###-#### partial u/G ok to pool
|
ELE06-01945
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 11:01:55 AM | A | PASS |
|
|
UNDERGROUND CONDUIT; ONE IS DEAD ENDED FOR FUTURE; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack underground ok to cover
|
ELE06-01346
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 10:39:16 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL walls phase 2 ok
|
ELE06-02057
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 10:03:26 AM | A | PASS |
|
|
We are ready for rough-in inspection with the corrections. We will have people on site by 9:00 working on the Panel and the Feeder to the Panel along with the employees from the Stereo Shoppe. If you have any questions, you can contact Brian Keith at ###-####. Thank you.; Phone #: ###-####
|
ELE05-03703
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 9:36:38 AM | A | PART |
|
|
Rough-in for first & third floor walls. Contact Dave @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie entire first floor walls ok half of third floor walls ok anop
|
ELE06-01518
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 9:07:22 AM | A | PART |
|
|
###-#### - ed Note: please inspect before 10:00 am is possible partial hot tub bonding ok
|
ELE05-02720
| Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 8:39:28 AM | A | PASS |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles R/I Ok
|
ELE06-02080
| Permanent Service | 6/6/2006 | 6/7/2006 | 6/7/2006 12:00:00 AM | A | CANC |
|
|
not ready mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
ELE04-02065
| Electrical Rough-In | 6/5/2006 | 6/7/2006 | 6/6/2006 4:28:03 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 10:37:04 PM. R/I Ok
|