Inspections for the day of: Wednesday, June 7, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-01863 Electrical Rough-In6/6/20066/7/20066/7/2006 4:34:29 PMPPASS
seth - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
ELE06-00981 Electrical Rough-In6/7/20066/7/20066/7/2006 3:38:09 PMPPASS
###-#### - bernie
R/I Ok
ELE06-02001 Final6/7/20066/7/20066/7/2006 3:18:28 PMPFAIL
Final inspection for air conditioning power. Please inspect after 3:30 p.m. Contacto Loren @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie
no recep within 25 ft
ELE06-01876 Final6/7/20066/7/20066/7/2006 3:05:17 PMPNR
bob- ###-#### cell
remove tile for the length of run and make required corrections straping and covers installed
ELE06-02083 Temporary Service6/7/20066/7/20066/7/2006 2:14:21 PMPFAIL
temp power for construction ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely
install connector on GEC and uncover ground rod
ELE06-02087 Conference6/7/20066/7/20066/7/2006 1:41:59 PMPPART
###-#### - andy Note: as early as possible afternoon
talked about knob an d tube and basement remodel
ELE06-00722 Electrical Rough-In6/7/20066/7/20066/7/2006 1:05:12 PMPPART
###-####. Scheduled by a contractor via Hello! on 6/7/2006 at 7:22:57 AM. Contact: ###-####.
walls ANOP
ELE06-02079 Electrical Rough-In6/6/20066/7/20066/7/2006 11:24:50 AMAPART
underground only//john ###-####
partial u/G ok to pool
ELE06-01945 Electrical Rough-In6/6/20066/7/20066/7/2006 11:01:55 AMAPASS
UNDERGROUND CONDUIT; ONE IS DEAD ENDED FOR FUTURE; Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack
underground ok to cover
ELE06-01346 Electrical Rough-In6/6/20066/7/20066/7/2006 10:39:16 AMAPART
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL
walls phase 2 ok
ELE06-02057 Electrical Rough-In6/6/20066/7/20066/7/2006 10:03:26 AMAPASS
We are ready for rough-in inspection with the corrections. We will have people on site by 9:00 working on the Panel and the Feeder to the Panel along with the employees from the Stereo Shoppe. If you have any questions, you can contact Brian Keith at ###-####. Thank you.; Phone #: ###-####
ELE05-03703 Electrical Rough-In6/6/20066/7/20066/7/2006 9:36:38 AMAPART
Rough-in for first & third floor walls. Contact Dave @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie
entire first floor walls ok half of third floor walls ok anop
ELE06-01518 Electrical Rough-In6/6/20066/7/20066/7/2006 9:07:22 AMAPART
###-#### - ed Note: please inspect before 10:00 am is possible
partial hot tub bonding ok
ELE05-02720 Electrical Rough-In6/6/20066/7/20066/7/2006 8:39:28 AMAPASS
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
R/I Ok
ELE06-02080 Permanent Service6/6/20066/7/20066/7/2006 12:00:00 AMACANC
not ready mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
ELE04-02065 Electrical Rough-In6/5/20066/7/20066/6/2006 4:28:03 PMPPASS
Scheduled by a contractor via Hello! on 6/5/2006 at 10:37:04 PM.
R/I Ok