Inspections for the day of: Wednesday, June 7, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM06-01889 Water and/or Sewer6/7/20066/7/20066/7/2006 3:59:20 PMPPART
Phone #: ###-#### Internet Inspection Request from: Gary Ziegler water tie under home ok need to have existing pvb for sprinkler tested and certified contractor to call when ready
PLM06-01085 Final6/7/20066/7/20066/7/2006 3:55:43 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dina Reynolds
PLM06-01734 Water and/or Sewer6/7/20066/7/20066/7/2006 2:56:39 PMPFAIL
hillside nursery - ###-#### need to remove pvc tee,s installed for cleanout,s and replace with approved directional clean out fitting,s need to remove 3034 pvc gravity sewer pipe in side foundation and replace with approved material need to water or air test sewer line contractor to recall when ready
PLM06-01867 Water and/or Sewer6/7/20066/7/20066/7/2006 2:41:09 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom
PLM06-01867 DOC - Permit Finaled6/7/20066/7/20066/7/2006 2:40:56 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom
PLM06-01893 Sprinkler (Final)6/7/20066/7/20066/7/2006 2:36:42 PMPPASS
###-#### - monty
PLM06-01887 Water and/or Sewer6/7/20066/7/20066/7/2006 1:52:47 PMPPART
Shelby; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to change water line to 1 1/4 1 inch to small for water distribution in home note sewer test ok ok to cover talked to contractor on site will recall when water line is ready
PLM06-01059 Final6/6/20066/7/20066/7/2006 12:49:39 PMAPART
need to provide additional backflow for ice machine need to provide trap on prep sink need strainers in mop & new floor sink provide air gap to existing drain to sink on front counter cap off all unused plumbing connection,s have all backflows tested and certified contractor to recall when ready
PLM06-01883 Water and/or Sewer6/6/20066/7/20066/7/2006 11:19:15 AMPPASS
BOB'S NUMBER ON SITE IS ###-####. THE JOB WILL BE READY FOR INSPECTION ABOUT 1:00. THANKYOU, SUSAN; Phone #: ###-#### Internet Inspection Request from: susan love
PLM06-01883 DOC - Permit Finaled6/7/20066/7/20066/7/2006 11:18:59 AMPPASS
BOB'S NUMBER ON SITE IS ###-####. THE JOB WILL BE READY FOR INSPECTION ABOUT 1:00. THANKYOU, SUSAN; Phone #: ###-#### Internet Inspection Request from: susan love
PLM05-04309 Plumbing Rough-in6/7/20066/7/20066/7/2006 11:03:49 AMAPART
Scheduled by a contractor via Hello! on 6/7/2006 at 5:57:51 AM. Contact: ###-####. need to test DWV under floor drain,s in north-west section of tower and repipe mop sink so tailpiece from fixture does not exceed twenty-four inches in length in walk through with Victor for this inspection
PLM06-01807 Water and/or Sewer6/6/20066/7/20066/7/2006 9:47:00 AMAPASS
john - water line/partial insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley water line test ok ok to cover