Inspections for the day of: Wednesday, June 7, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-01044 FIRE-Conference6/5/20066/7/20066/8/2006 3:55:05 PMADONE
On site discussion regarding permitted work scope, fire code review notes, modifications which affect the sprinkler system will require a fire sprinkler permit.
BLD06-01347 FIRE-Final Inspection6/6/20066/7/20066/7/2006 3:28:02 PMAFAIL
Door hardware at the main entry/exit does not meet requirements, need to provide fire extinguisher within the TI space as discussed, two offices have non-approved door hardware.
FIR06-00401 INSP-Final Inspection6/7/20066/7/20066/7/2006 3:25:57 PMAPASS
Overhead fire sprinkler work passed final field inspection.
BLD06-01348 FIRE-Final Inspection6/6/20066/7/20066/7/2006 2:46:19 PMAFAIL
Need to provide and mount a fire extinguisher with current tag as discussed, door hardware at the south exit does not meet requirements as installed.
BLD06-00639 FIRE-Final Inspection6/6/20066/7/20066/7/2006 2:43:31 PMAPASS
Fire life safety is acceptable.
BLD06-00641 FIRE-Final Inspection6/6/20066/7/20066/7/2006 2:42:48 PMAPASS
Fire life safety is satisfactory, required corrections are complete.
FIR06-00354 INSP-Sprinkler Rough-in6/5/20066/7/20066/7/2006 2:41:43 PMAPART
Overhead fire sprinkler rough-in is acceptable.
FIR06-00417 INSP-Final Inspection6/6/20066/7/20066/7/2006 2:40:47 PMAPASS
Fire alarm passed final inspection.
FIR06-00416 INSP-Final Inspection6/6/20066/7/20066/7/2006 2:40:13 PMAPASS
Fire alarm work is satisfactory, permit finaled.
FIR06-00369 INSP-Final Inspection6/6/20066/7/20066/7/2006 11:50:42 AMAPASS
Fire sprinkler work passed final inspection.
BLD06-00324 FIRE-Final Inspection6/6/20066/7/20066/7/2006 11:15:59 AMAPASS
The required corrections have been made and verified for completion, fire life safety passed inspection.
FIR06-00283 INSP-Conference6/6/20066/7/20066/7/2006 10:59:08 AMADONE
On site visit to discuss fire sprinkler spacing issues.