MIS06-00136
| FIR-Final | 6/7/2006 | 6/7/2006 | 6/7/2006 5:25:24 PM | P | FAIL |
|
|
Provide tag for the fire extinguisher, repair the three emergency lights and the exit sign at the walk through area
|
BLD05-02957
| FIRE-Final Inspection | 6/7/2006 | 6/7/2006 | 6/7/2006 5:24:01 PM | P | FAIL |
|
|
Need to provide a exit/emergency light as shown on the approved plans and final the fire alarm permit.
|
BLD06-00531
| FIRE-Conference | 6/6/2006 | 6/7/2006 | 6/7/2006 5:23:12 PM | A | DONE |
|
|
I told John that I was not concerned about the open area of the ceiling and that it appears that the duct smoke detectors are not going to be required.
|
BLD05-02094
| FIRE-Final Inspection | 6/7/2006 | 6/7/2006 | 6/7/2006 3:34:23 PM | P | FAIL |
|
|
Need to final the shell permit, tag the fire extinguisher and either test the duct smoke detetors or remove them since they are not required per code.
|
BLD05-03473
| FIRE-Final Inspection | 6/7/2006 | 6/7/2006 | 6/7/2006 2:42:20 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00065
| INSP-Sprinkler Rough-in/Hydro | 6/6/2006 | 6/7/2006 | 6/7/2006 2:16:06 PM | A | PART |
|
|
Above ground hydro test passed. Sprinkler rough-in failed due to the upright sprinkler heads not meeting NFPA 13 8.6.5.2.1.6 and 8.6.5.2.1.7. Also the sprinkler heads are overspaced at the west end of the sprinkler system.
|
FIR06-00118
| INSP-Final Inspection | 6/6/2006 | 6/7/2006 | 6/7/2006 11:09:36 AM | A | FAIL |
|
|
No test performed due to a 15cd a/v missing in corridor 107 that is shown on the approved plans.
|
FIR06-00314
| INSP-Sprinkler Rough-in/Hydro | 6/6/2006 | 6/7/2006 | 6/7/2006 8:57:33 AM | A | PASS |
|
|
Sprinkler rough-in passed. Some of the drops are overspaced by a few inches. These sprinklers are on 15' long drops which once tile is in may be spaced correctly. This will be checked at final.
|
FIR06-00044
| INSP-Final Inspection | 6/6/2006 | 6/7/2006 | 6/7/2006 8:55:11 AM | A | PASS |
|
|
Permit finaled
|