ESC04-00022
| BMP Violation | 6/7/2006 | 6/7/2006 | 6/7/2006 11:07:42 AM | P | PART |
|
|
Talked to RP about watching construction entrance to make sure it is adequate for preventing any trackout onto Warm Springs. Also suggested that some type of access control be installed along site facing Warm Springs if problems arise with contractors or people bypassing construction entrance.
|
ESC06-00513
| BMP Violation | 6/7/2006 | 6/7/2006 | 6/7/2006 10:41:09 AM | A | PASS |
|
|
Site looks better. Silt fence and sediment barriers have been installed. Talked to RP about doing some sweeping along front of property on Holden. Will follow up.
|