FIR06-00474
| FIR-Aging Inspection | 6/7/2010 | 6/7/2010 | 6/11/2010 3:41:07 PM | | DONE |
|
|
Site visit completed.
|
FIR05-00238
| FIR-Aging Inspection | 6/7/2010 | 6/7/2010 | 6/10/2010 12:20:20 PM | | DEFR |
|
|
Can be tested in conjunction with new work for the elevator upgrade in progress per discussion on site.
|
FIR06-00531
| FIR-Aging Inspection | 6/7/2010 | 6/7/2010 | 6/10/2010 12:14:43 PM | | DONE |
|
|
|
FIR05-00537
| FIR-Aging Inspection | 6/7/2010 | 6/7/2010 | 6/10/2010 11:52:07 AM | | DONE |
|
|
|
FIR09-00536
| INSP-Sprinkler Rough-in/Hydro | 6/7/2010 | 6/7/2010 | 6/7/2010 4:08:31 PM | P | PART |
|
|
Hydrostatic testing for the first floor and basement level systems passed.
|
FIR09-00536
| INSP-Sprinkler Rough-in/Hydro | 6/4/2010 | 6/7/2010 | 6/7/2010 4:07:24 PM | P | PART |
|
|
Overhead rough-in at the basement and 1st floor levels approved for cover. Discussed items remaining for final.
|
FIR10-00165
| INSP-Sprinkler Rough-in | 6/4/2010 | 6/7/2010 | 6/7/2010 4:06:03 PM | A | PART |
|
|
Noted correction items field verified for completion, rough-in passed, okayed overhead cover. Contractor to be aware of possible light fixture obstructions that may occur due to type/proximity of appliances installed.
|
BLD10-01155
| FIRE-Final Inspection | 6/2/2010 | 6/7/2010 | 6/7/2010 12:47:31 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 6/4/2010 | 6/7/2010 | 6/4/2010 12:30:35 PM | A | CANC |
|
|
Basement Rough-In Kerry is the person to contact. Would tike to have this First thing in the morning. 8:00 am if possable. Inspection requested from web by: Brad Bettencourt Phone #: ###-#### Inspection cancelled from web by: Brad Bettencourt
|