Inspections for the day of: Monday, June 7, 2010.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00202 General Inspection6/7/20106/7/20106/7/2010 3:10:46 PM DONE
ESC09-00202 DOC - Permit Finaled6/7/20106/7/20106/7/2010 3:10:29 PMPPASS
ESC09-00507 General Inspection6/7/20106/7/20106/7/2010 2:28:57 PMPPART
Verbal to RP: BMPs need maintenance, as well, discussions needed with the out of state property owner to determine when additional phase will occcur or when all re-vegetation will be completed so the structual bmps can be removed. Regular inspections are required until at which time the permit can be finaled.
ESC10-00363 Site Preparation6/7/20106/7/20106/7/2010 2:10:45 PMPPART
Verbal to RP: Sign needs to be posted and clean up of dirt from sidewalk, gutter, etc. by the end of the day. Sediment barriers are in place downslope.