Inspections for the day of: Monday, June 7, 2010.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01833 Aging Inspection6/7/20106/7/20106/7/2010 3:41:50 PM DONE
ESC05-01833 DOC - Permit Finaled6/7/20106/7/20106/7/2010 3:41:43 PMPPASS
ESC05-01836 Aging Inspection6/7/20106/7/20106/7/2010 3:41:32 PM DONE
ESC05-01836 DOC - Permit Finaled6/7/20106/7/20106/7/2010 3:41:26 PMPPASS
ESC05-01835 Aging Inspection6/7/20106/7/20106/7/2010 3:41:04 PM DONE
ESC05-01835 DOC - Permit Finaled6/7/20106/7/20106/7/2010 3:40:56 PMPPASS
ESC10-00276 Random Inspection6/7/20106/7/20106/7/2010 2:25:37 PMPFAIL
Message to RP:
Clean up all sediment and derbris off of Opus St. Also remove all material off of the sidewalk(ACHD Right Away) Will re-inspect on 6/9/10am
ESC09-00163 General Inspection6/7/20106/7/20106/7/2010 9:39:10 AM DONE
all work is complete.
ESC09-00163 DOC - Permit Finaled6/7/20106/7/20106/7/2010 9:38:55 AMPPASS
ESC08-00970 General Inspection6/7/20106/7/20106/7/2010 9:15:50 AM DONE
All work is complete.
ESC08-00970 DOC - Permit Finaled6/7/20106/7/20106/7/2010 9:15:34 AMPPASS
ESC10-00013 General Inspection ESC6/7/20106/7/20106/7/2010 9:14:53 AM PART
Verbal to RP:
MAintain washout pit and make sure it is lined with plastic prior to next pour date. Also maintain all storm drain inlet protection. Will re-inspect on 6/11/10
ESC10-00404 Site Preparation5/26/20106/7/20106/7/2010 9:02:42 AMANR
Rp notified me that there is no start date due to grading permit conflicts. Will be notified by the RP once a date is set. If notification does not occur by 6/29/10, Will contact the RP the following day 6/30/10 for a update.
ESC09-00733 General Inspection ESC6/7/20106/7/20106/7/2010 8:59:54 AM PART
Spoek with RP over final stabilization. They hand broadcasted a seed blend. They will be re-applying the seed blend. Will re-inspect in 2 months for a site final.
ESC10-00352 Site Preparation6/1/20106/7/20106/7/2010 8:25:29 AMANR
ESC09-00129 General Inspection6/7/20106/7/20106/7/2010 8:07:45 AM DONE
All demo work is completed.
ESC09-00129 DOC - Permit Finaled6/7/20106/7/20106/7/2010 8:07:20 AMPPASS