FIR15-00822
| INSP-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 2:46:07 PM | A | PART |
|
|
I stopped at the project site three times today to verify static pressure on the underground supply line. At 7:00am the pressure was at 61psi, at 9:00am the pressure was at 71psi and at 1:00pm the pressure was at 74 psi. I contacted the project superintendant and the fire sprinkler contractor and let them know that I could not sign off until directed by my supervisor.
Mike is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR16-00361
| INSP-Sprinkler Rough-in/Hydro | 6/7/2016 | 6/7/2016 | 6/7/2016 2:28:35 PM | P | PASS |
|
|
Piping above hardlids is ok to cover.
|
FIR16-00152
| INSP-Sprinkler Rough-in | 6/6/2016 | 6/7/2016 | 6/7/2016 1:22:23 PM | A | CANC |
|
|
Paul Phone #: ###-####
|
BLD16-01990
| FIRE-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 11:34:32 AM | A | PASS |
|
|
life safety passed
|
BLD16-01492
| FIRE-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 8:42:24 AM | A | FAIL |
|
|
Jim and I discussed the need for drawings and small documents that were not on site. I accessed the fire review notes and went over many of the listed items.
|
FIR16-00349
| INSP-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 8:41:23 AM | A | PASS |
|
|
Permit finaled
|