Inspections for the day of: Wednesday, June 7, 2017.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01006 General Inspection6/7/20176/7/20176/8/2017 12:34:41 PM PASS
WIP on SFH. Some trackout in subdivision. Subdivision BMPs are ok.
Correction sweep up trackout regularly.
ESC17-00620 Site Preparation6/6/20176/7/20176/7/2017 3:58:04 PMPPASS
Sign is posted.
Subdivision BMPs are in place. Okay to start

Grant Phone #: ###-####
ESC16-01190 General Inspection6/7/20176/7/20176/7/2017 10:05:38 AM PASS
No WIP yet. No ESC issues.
ESC16-01074 Site Final6/7/20176/7/20176/7/2017 9:56:50 AMPPASS
ESC16-01074 Aging Inspection6/7/20176/7/20176/7/2017 9:56:40 AM PASS
Project complete okay to final.
ESC16-01187 General Inspection6/7/20176/7/20176/7/2017 9:36:47 AM PASS
WIP on interior and exterior. No trackout, sign is posted. No corrections.
ESC16-00878 Aging Inspection6/7/20176/7/20176/7/2017 9:29:10 AM CANC
ESC16-00644 Site Final6/7/20176/7/20176/7/2017 9:28:17 AMPPASS
ESC16-00353 General Inspection6/7/20176/7/20176/7/2017 9:18:50 AM PASS
No WIP. BMPs okay. No corrections.
ESC17-00625 General Inspection5/31/20176/7/20176/6/2017 1:01:57 PMAPASS
Met RP on site and walked through dewatering set up and plan. Well pumps are currently begin set. The water will run through a ditch to a sedimentation pond, then flow into a stormwater pond, then overland flow through a field that is the next stage of development, then into the canal drainage ditch. This set up should be sufficient to settle sediment particles in the dewatering water. okay to begin dewatering.