MIS18-00222
| Set Bond Amount | 6/7/2018 | 6/7/2018 | 6/7/2018 2:21:39 PM | | DONE |
|
|
Set bond for demo of approx 900 sq. ft. house. (Garage/apt not included in demo). $2800.00 demo bond required.
|
MIS18-00219
| Set Bond Amount | 6/6/2018 | 6/7/2018 | 6/7/2018 2:08:55 PM | A | DONE |
|
|
Dale Phone #: ###-####. $5200.00 demo bond required.
|
BLD16-03302
| BLD-Conference | 6/7/2018 | 6/7/2018 | 6/7/2018 12:00:00 AM | A | DONE |
|
|
Conference with Architect and site manager. Membrane removal has been authorized and is currently being removed from frames.
|