MEC18-02538
| Final | 6/5/2018 | 6/7/2018 | 6/7/2018 3:51:06 PM | P | NR |
|
|
Please call Kyle to ensure installation is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg- still installing- will reschedule per phone call with Kyle
|
MEC18-02585
| Final | 6/6/2018 | 6/7/2018 | 6/7/2018 3:31:44 PM | P | PASS |
|
|
please call our lead installer Dakoda when 30 mins in route. 2-4p would work best for us if that works with your scheduling Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace a/c coil co ok
|
MEC18-02402
| Final | 6/6/2018 | 6/7/2018 | 6/7/2018 3:14:35 PM | P | PASS |
|
|
Please call Kyle to ensure inspection is complete. ###-#### Thanks! Phone #: ###-#### Inspection requested via web by Rick Borg- furnace a/c coil co ok
|
MEC18-02550
| Final | 6/6/2018 | 6/7/2018 | 6/7/2018 2:28:31 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- furnace a/c coil co ok
|
MEC18-02365
| Final | 6/6/2018 | 6/7/2018 | 6/7/2018 1:36:48 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- condensate drain off mini split needs ran in PVC not flex line- furnace in crawl a/c ok
|
MEC18-00249
| Final | 6/7/2018 | 6/7/2018 | 6/7/2018 1:16:40 PM | P | PASS |
|
|
final ok
|
MEC18-00265
| Final | 6/7/2018 | 6/7/2018 | 6/7/2018 1:16:20 PM | P | PASS |
|
|
final ok
|
MEC18-02613
| Final | 6/7/2018 | 6/7/2018 | 6/7/2018 1:15:02 PM | P | FAIL |
|
|
Final sign off for refrigeration install. Ultraviolet tape has been applied to line sets Phone #: ###-#### Inspection requested via web by Drew Tverdy- lineset copper is touching metal roof jack needs seperation and arma flex fixed- need to seal roof jack weather tight
|
MEC18-00272
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 12:28:58 PM | A | PASS |
|
|
rough in inspection for duct insulation . Tyson is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- firewrap ok- ok to install ceiling tiles
|
MEC18-02539
| Final | 6/7/2018 | 6/7/2018 | 6/7/2018 12:19:13 PM | P | PASS |
|
|
as early as possible please call Dave ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- final ok
|
MEC18-02539
| Pressure Test | 6/7/2018 | 6/7/2018 | 6/7/2018 12:18:52 PM | P | PASS |
|
|
as early as possible please call Dave ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- 20lb gas pass
|
MEC18-02260
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 11:22:12 AM | A | PASS |
|
|
Repairs have been made and ready for rough-in inspection Phone #: ###-#### Inspection requested via web by Benny Arreola- R/I ok
|
MEC18-02536
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 11:20:29 AM | A | NR |
|
|
gas inspection Phone #: ###-#### Inspection requested via web by Benny Arreola
|
MEC18-02536
| Pressure Test | 6/7/2018 | 6/7/2018 | 6/7/2018 11:20:00 AM | A | PASS |
|
|
gas inspection Phone #: ###-#### Inspection requested via web by Benny Arreola- 20lb gas pass
|
MEC18-02537
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 11:19:33 AM | A | NR |
|
|
gas line Phone #: ###-#### Inspection requested via web by Benny Arreola- still installing
|
MEC18-01514
| Final | 6/6/2018 | 6/7/2018 | 6/7/2018 10:34:57 AM | A | FAIL |
|
|
please call 1/2 hr ahead to meet // Mike Phone #: ###-####- needs 2nd wet switch installed- need drip leg between shut valve and applince- need to seal OA at R/A plenum- fix register in stairwell- need airbalance and duct blast report onsite
|
MEC18-02587
| Pressure Test | 6/6/2018 | 6/7/2018 | 6/7/2018 10:02:00 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pass- need drip leg between shutoff valve and appliance- need 1" or more clearance to b vent at roof from insulation or install insulation shield by final
|
MEC18-02353
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 9:39:30 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero- no one home
|
MEC18-02372
| Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 8:21:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by claude croy- R/I ok
|
MEC17-02920
| Mec-Aging Inspection | 6/7/2018 | 6/7/2018 | 6/7/2018 8:08:03 AM | | FAIL |
|
|
no call for final inspection- dont no if corrections were made
|
MEC17-02919
| Mec-Aging Inspection | 6/7/2018 | 6/7/2018 | 6/7/2018 8:06:35 AM | | FAIL |
|
|
no call for final- dont no if correction has been made
|
MEC18-02125
| Conference | 6/6/2018 | 6/7/2018 | 6/6/2018 10:46:42 AM | A | CANC |
|
|
Blast Witness at 10 am Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|