Inspections for the day of: Friday, June 7, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02029 Final6/7/20196/7/20196/7/2019 3:25:26 PMPPASS
Contact: Danny Talbot Phone #: ###-#### Inspection requested via web by Deb Gooden...
converted 240V circuit at coffee station into 2 120V outlet circuits-installed GFCI protection and circuit labelling...ok to final
ELE18-03476 Electrical Rough-In6/6/20196/7/20196/7/2019 3:06:37 PMPPASS
Zack Phone #: ###-####....
Area3 grid ok line 16 up to 11
ELE18-03803 Rough-In Permanent Service6/5/20196/7/20196/7/2019 2:05:37 PMPPASS
Russell Phone #: ###-####...
ok to cover complete bathroom
service outlet and light installed in attic
ELE16-01305 Final6/7/20196/7/20196/7/2019 1:47:42 PMPPASS
closing permit...contractor was not given access to fix corrections at time permit was pulled
a new permit is pulled by another contractor and has agreed to make corrections..19-01750
ELE19-02059 Permanent Service6/7/20196/7/20196/7/2019 1:43:56 PMPCANC
Please arrive before 3:00 as no one will be available after 3:00 at the residence

Phone #: ###-#### Inspection requested via web by Eric Schroeder
needed to be a final inspection
ELE19-02059 Final6/7/20196/7/20196/7/2019 1:43:23 PMPPASS
Please arrive before 3:00 as no one will be available after 3:00 at the residence

Phone #: ###-#### Inspection requested via web by Eric Schroeder....
At time of inspection wire for hot tub and breaker for hot tub in panel have been removed
ok to final
ELE19-01999 Electrical Rough-In6/6/20196/7/20196/7/2019 1:10:13 PMPPASS
Please call the number above prior to heading to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting..
UL listed equipment verified
all electrical outside but will need access..behind fence on left
ELE19-02013 Final6/5/20196/7/20196/7/2019 12:31:12 PMPPASS
Please call customer when on your way. Thanks. Phone #: ###-#### Inspection requested via web by Same Electric...
new 30A circuit to new disconnect
wire to existing A/C unit
ok to final
ELE18-04013 Final6/6/20196/7/20196/7/2019 11:45:23 AMPPART
Roof top units ready for final. Bruce is our contact at ###-####. We will try to call the inspector to schedule access and timing. Thank You! Phone #: ###-#### Inspection requested via web by Kelly Felin...
multiple buildings...contractor having issues getting access to all spaces in buildings

verified disconnects, fuses, and service outlets on rooftops

labelling of disconnects and panels will be done as access is granted...images will be supplied

future final will need scheduled to go over HVAC unit labelling and panel labelling
ELE19-01713 Final6/6/20196/7/20196/7/2019 11:07:56 AMAPART
BME shuts down for lunch at 11. If we could make that time, that would be awesome. If not, please call Doug at ###-#### to let him know what time. He wants to be there. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
partial final....waiting on blackards being made and installed for panels and available fault current for service
will send pictures when applied
ELE18-03983 Final6/6/20196/7/20196/7/2019 11:05:26 AMAPASS
11:00 if possible. They shut down for lunch at that time. Doug will meet you there. Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
GFCI protection verified...multiple GFCI breakers installed in new panels...ok to final
ELE18-02503 Final6/7/20196/7/20196/7/2019 11:03:17 AMAPASS
final out shop....work was taken over by different electrical contractor under permit 18-03983
ELE18-03919 Final6/7/20196/7/20196/7/2019 10:17:29 AMPPASS
reinspection final Phone #: ###-#### Inspection requested via web by Tim Dunlop...
corrections made
ok to final
ELE19-02069 Electrical Rough-In6/6/20196/7/20196/7/2019 10:10:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Patrick Paz...
ok to cover new bathroom, closet, and bedroom extension
ELE19-00570 Final6/6/20196/7/20196/7/2019 9:33:54 AMAPASS
Call our office ###-#### with at least a 30 minute notice to meet you out there please. If you have any questions please feel free to contact Jason ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan...
ok to final
ELE18-02961 Final6/3/20196/7/20196/7/2019 9:18:28 AMANR
Phone #: ###-#### Inspection requested via web by Elizabeth Gawle...
island needs panelling finished before final
exposed romex
ELE18-03866 Final6/6/20196/7/20196/7/2019 8:49:53 AMAPART
Phone #: ###-#### Inspection requested via web by Jeremy Cloud...
temp occupency for building ok
leaving permit open for elevator-needs installed
MIS19-00149 ELE-Conference6/5/20196/7/20196/7/2019 7:14:52 AMPPASS
exterior lights w/o permit Phone #: ###-####
permit pulled by contractor...19-02073