BLD18-01491
| BLD-Framing/Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 5:03:34 PM | P | FAIL |
|
|
Need Mech rough-in...
|
BLD19-00652
| BLD-Footing | 6/7/2019 | 6/7/2019 | 6/7/2019 5:03:00 PM | P | CANC |
|
|
No footing required for this permit...
|
BLD18-03242
| BLD-Framing/Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 5:01:15 PM | P | CANC |
|
|
Wrong permit number...
|
BLD19-00485
| BLD-Wall Bracing | 6/7/2019 | 6/7/2019 | 6/7/2019 5:00:49 PM | P | PASS |
|
|
Corrections SAT...
|
BLD19-01149
| BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 4:59:51 PM | P | PASS |
|
|
Inspection requested via web by BRS Permitting
|
BLD19-01149
| DOC - Permit Finaled | 6/7/2019 | 6/7/2019 | 6/7/2019 4:59:30 PM | P | PASS |
|
|
|
BLD19-01308
| BLD-Conference | 6/6/2019 | 6/7/2019 | 6/7/2019 4:59:08 PM | P | DONE |
|
|
Looking for a final framing consult before I install beams and OSB on Friday night that require Portal frame nailing as It would be difficult to fix anything once this nailing has been completed. I will be available all afternoon but the earlier I the afternoon the better. I would also like to review the overall project with the new inspector that replaced Jim Sly as they will be the inspector for the balance of my project Inspection requested via web by Ron MacCulloch
|
BLD19-00603
| BLD-Footing | 6/6/2019 | 6/7/2019 | 6/7/2019 11:32:45 AM | A | PASS |
|
|
Work in progress...
|
BLD19-00602
| BLD-Footing | 6/6/2019 | 6/7/2019 | 6/7/2019 11:32:30 AM | A | PASS |
|
|
Work in progress...
|
BLD19-00601
| BLD-Footing | 6/6/2019 | 6/7/2019 | 6/7/2019 11:32:18 AM | A | PASS |
|
|
Work in progress...
|
BLD19-00597
| BLD-Footing | 6/6/2019 | 6/7/2019 | 6/7/2019 11:32:07 AM | A | PASS |
|
|
Work in progress...
|
BLD19-00010
| BLD-Other | 6/5/2019 | 6/7/2019 | 6/7/2019 11:31:38 AM | A | PEND |
|
|
Second layer and caulking...
|