BLD00-03516
| BLD-Final | 6/7/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 09:29:18. Contact: ###-####.temp occ ok for all areas but the high pile s 6/8/2001 5:43:45 PM toage in center of bldg. copy of occ. card siged to be flled down town . 6/8/2001 5:45:20 PM
|
BLD01-00011
| BLD-Foundation | 6/7/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | A | PART |
|
|
###-#### 5.3 to 10/a d wall rebar ok pending special insp. reports will place tue. 6/8/2001 9:26:58 AM
|
BLD01-00839
| BLD-Footing | 6/7/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | A | PASS |
|
|
doc please give one hour notice if you can please ###-####interior footing
|
BLD01-01531
| BLD-Footing | 6/7/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | PART |
|
|
ft insp - rob ###-#### n/r ok covered with special insp. bob aronald. 6/8/2001 3:26:04 PM
|
BLD01-00562
| BLD-Foundation | 6/8/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 06:48:55. Contact: ###-####. hold downs not required change approved by 301 double doors gone. 6/8/2001 2:01:42 PM
|
BLD00-03719
| BLD-Final | 6/8/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | PASS |
|
|
###-#### ran out of l/c forms for on site final ok. 6/8/2001 5:38:41 PM
|
BLD01-01232
| BLD-Framing/Rough-in | 6/8/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | PASS |
|
|
reinspection Mark ###-####
|
BLD01-00126
| BLD-Final | 6/8/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | FAIL |
|
|
randy-- ###-#### fn occ deck cannot incroch into p/l setback 2nd floor west side. 6/8/2001 2:49:36 PM
|
BLD01-01232
| BLD-Energy code compliance | 6/8/2001 | 6/8/2001 | 6/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 6/8/2001 3:42:33 PM
|