Inspections for the day of: Friday, June 8, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01662 Rough-in6/5/20016/8/20016/8/2001 12:00:00 AMAPASS
Sabrina ###-#### 0 clearance gas fireplace
MEC01-01210 Rough-in6/7/20016/8/20016/8/2001 12:00:00 AMAPART
r/i ok on south half 6/8/2001 10:26:43 AM
MEC01-01524 Pressure Test6/7/20016/8/20016/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 16:49:21. Contact: ###-####.
MEC01-00781 Final6/8/20016/8/20016/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/08/2001 at 06:37:54. Contact: ###-####.
MEC01-01685 Rough-in6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
###-####
MEC01-01685 Pressure Test6/8/20016/8/20016/8/2001 12:00:00 AMPFAIL
remove gasline from court yard concrete wall and redo under courtyard and up for bbq. need pressure test and inspection before cover 6/8/2001 2:14:35 PM
MEC01-01205 Pressure Test6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/08/2001 at 08:51:35. Contact: ###-####. for future, no equipment now 6/8/2001 1:40:20 PM
MEC01-01603 Final6/8/20016/8/20016/8/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 06/08/2001 at 08:54:23. Contact: ###-####. cancelled as per #411 6/8/2001 12:34:27 PM
MEC01-01681 Final6/8/20016/8/20016/8/2001 12:00:00 AMPFAIL
corrections posted, need installation guide 6/8/2001 11:35:24 AM
MEC01-01678 Final6/8/20016/8/20016/8/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/08/2001 at 09:26:27. Contact: ###-####. still in r/i 6/8/2001 3:14:40 PM
MEC01-00909 Final6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
fn insp- randy ###-####