Inspections for the day of: Friday, June 8, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-01850 Electrical Rough-In6/7/20016/8/20016/8/2001 12:00:00 AMAPASS
conference Shane Korte ###-#### ok conference 6/8/2001 9:39:50 AM
ELE01-01206 Final6/7/20016/8/20016/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 13:36:33. Contact: ###-####. survey nec 210-52 (2)(a) 6/8/2001 10:09:36 AM
ELE01-01290 Final6/7/20016/8/20016/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 13:37:37. Contact: ###-####. ok final 6/8/2001 10:25:02 AM
ELE01-00977 Electrical Rough-In6/7/20016/8/20016/8/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/07/2001 at 14:23:31. Contact: . ok temp occ in designated areas 6/8/2001 11:25:26 AM
ELE01-00621 Final6/7/20016/8/20016/8/2001 12:00:00 AMANR
###-#### reinspection not ready 6/8/2001 8:59:21 AM
ELE01-01875 Final6/7/20016/8/20016/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/07/2001 at 16:32:17. Contact: ###-####. ok final 6/8/2001 9:08:49 AM
ELE01-01877 Temporary Service6/7/20016/8/20016/8/2001 12:00:00 AMPPASS
t/p ###-####- annetta t/s u/g n ok 6/8/2001 11:40:26 AM
ELE01-01879 Rough-In Permanent Service6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
###-#### p/s u/g n ok - ok cover ri 6/8/2001 2:01:24 PM
ELE01-01160 Final6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
###-#### ok final 6/8/2001 11:59:23 AM
ELE01-00621 Final6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
late pm ###-#### ok final 6/8/2001 2:36:50 PM
ELE01-01815 Final6/8/20016/8/20016/8/2001 12:00:00 AMPPASS
Added by Inspector: 412 On 6/8/2001 2:00:15 PM ok street lighting ok final