PLM04-01530
| Water and/or Sewer | 6/7/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | A | PASS |
|
|
dan- ###-#### sw final ok 6/8/2004 9:06:31 AM
|
PLM04-01532
| Sprinkler (Final) | 6/7/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | PASS |
|
|
###-#### chad sp final ok 6/8/2004 2:59:25 PM
|
PLM04-01533
| Sprinkler (Final) | 6/7/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | FAIL |
|
|
###-#### chad
|
PLM04-00626
| Final | 6/8/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/8/2004 at 8:40:49 AM. Contact: ###-####. final ok 6/8/2004 2:42:46 PM
|
PLM04-01026
| Plumbing Rough-in | 6/8/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel needs water softenor drain and pex with in 12" of recessed light fixtures in the kitchen. 6/8/2004 3:16:35 PM
|
PLM04-01540
| Sprinkler (Final) | 6/8/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | PASS |
|
|
###-#### Renee sp final ok 6/8/2004 1:30:30 PM
|
PLM04-01327
| Sprinkler (Final) | 6/8/2004 | 6/8/2004 | 6/8/2004 12:00:00 AM | P | PASS |
|
|
sp final ok 6/8/2004 1:49:28 PM
|