BLD02-03091
| BLD-Aging Inspection | 6/8/2005 | 6/8/2005 | 6/13/2005 3:09:24 PM | | DONE |
|
|
Spoke today with Brian Burgar of Garden City Public Works, he explained an additional valve in the area has been opened and should increase the available flow. I called Jim Danes with De Best fire, he is to schedule an inspection to verify 1500gpm fire flow.
|
FIR04-00358
| INSP-Sprinkler Rough-in/Hydro | 6/8/2005 | 6/8/2005 | 6/8/2005 2:59:33 PM | P | PART |
|
|
Overhead hydrostatic test of basement, first floor, and antifreeze systems passed two hour test.
|
BLD05-00544
| FIRE-Final Inspection | 6/6/2005 | 6/8/2005 | 6/8/2005 1:33:20 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR05-00302
| INSP-Final Inspection | 6/7/2005 | 6/8/2005 | 6/8/2005 1:29:03 PM | P | PASS |
|
|
Hood suppresion system operated properly under test conditions.
|
FIR05-00208
| INSP-Final Inspection | 6/8/2005 | 6/8/2005 | 6/8/2005 12:57:34 PM | P | PART |
|
|
Rough-in passed inspection. Final pending ceiling tile installation at head locations and all escutcheons on.
|