Inspections for the day of: Monday, June 8, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00249 INSP-Supply line flush6/5/20096/8/20096/8/2009 5:51:11 PMPPART
UG fire supply line flush completed okay. See permit activities for FIR09-00255 regarding line cover inspections done in conjunction for this permit also.
FIR08-00578 INSP-Sprinkler Rough-in/Hydro6/5/20096/8/20096/8/2009 5:48:00 PMPPART
Overhead rough-in approved for cover at the sheetrock ceilings.
FIR08-00577 INSP-Sprinkler Rough-in/Hydro6/5/20096/8/20096/8/2009 5:46:50 PMPPART
Overhead rough-in okayed for cover.
FIR08-00579 INSP-Sprinkler Rough-in/Hydro6/5/20096/8/20096/8/2009 3:09:43 PMPFAIL
See plans for locations in need of adjustment including one overspaced SW head and two pendents to be re-cut.
FIR09-00256 INSP-Supply line flush6/5/20096/8/20096/8/2009 1:59:01 PMPPART
UG fire supply line flushing completed satisfactory. Note, see FIR09-00255 permit activities for UG cover inspection completed for this permit also.
FIR09-00255 INSP-Supply line flush6/5/20096/8/20096/8/2009 1:55:05 PMPPART
UG fire supply line flushing completed okay.
BLD08-01098 FIRE-Final Inspection6/8/20096/8/20096/8/2009 1:20:51 PMPPART
Life safety inspection okayed for unit 451 only.
FIR07-00827 INSP-Final Inspection6/8/20096/8/20096/8/2009 12:49:39 PMPPASS
Last remaining section per the scope of fire sprinkler work passed rough-in and final inspections, permit approved for final status.
BLD08-01098 FIRE-Final Inspection6/5/20096/8/20096/8/2009 11:28:35 AMADONE
Duplicate inspection request, will be on site at 1:00 pm today.
BLD08-01992 FIRE-Final Inspection6/5/20096/8/20096/8/2009 11:26:58 AMAPASS
Correction notice items verified for completion, fire life safety is acceptable. Security gate width at the fire apparatus access road approved per M. Senteno (IFC 2006 503.2.1, 503.6). FD access for project phase one also okayed per M. Senteno and S. Arellano.
BLD08-01994 FIRE-Final Inspection6/5/20096/8/20096/8/2009 11:26:34 AMAPASS
Correction notice items verified for completion, fire life safety is acceptable. Security gate width at the fire apparatus access road approved per M. Senteno (IFC 2006 503.2.1, 503.6). FD access for project phase one also okayed per M. Senteno and S. Arellano.
BLD08-01993 FIRE-Final Inspection6/5/20096/8/20096/8/2009 11:25:56 AMAPASS
Correction notice items verified for completion, fire life safety is acceptable. Security gate width at the fire apparatus access road approved per M. Senteno (IFC 2006 503.2.1, 503.6). FD access for project phase one also okayed per M. Senteno and S. Arellano.