ESC11-00234
| General Inspection | 6/1/2011 | 6/1/2011 | | | |
|
|
|
ELE10-00135
| ELE-Aging Inspection | 6/8/2011 | 6/8/2011 | 6/10/2011 2:09:26 PM | | DONE |
|
|
still under construction
|
MIS11-00127
| ELE-Conference | 6/8/2011 | 6/8/2011 | 6/8/2011 3:16:05 PM | P | DONE |
|
|
Forrest France Phone #: ###-#### Talked with building renter about electrical corrections need to be done by licenced electrical contractor.
|
ELE11-01191
| Permanent Service | 6/8/2011 | 6/8/2011 | 6/8/2011 3:12:21 PM | P | NR |
|
|
David please call 45 min before going out Phone #: ###-####
|
ELE11-01191
| Conference | 6/8/2011 | 6/8/2011 | 6/8/2011 3:12:04 PM | P | DONE |
|
|
David please call 45 min before going out Phone #: ###-#### talked with home owner about service requirements for service turn back on after more than a year of being turned off, update of grounding system. 2-ground rods 6 ft. apart.water pipe bond
|
ELE11-01181
| Permanent Service | 6/8/2011 | 6/8/2011 | 6/8/2011 3:07:32 PM | P | DONE |
|
|
David please call 45 min before going out Phone #: ###-#### talked with home owner about service requirements-update grounding system 2- ground rods, 6ft. apart
|
ELE11-00302
| Final | 6/8/2011 | 6/8/2011 | 6/8/2011 12:09:35 PM | P | PASS |
|
|
Gene Phone #: ###-#### final ok
|
ELE09-02444
| ELE-Aging Inspection | 6/8/2011 | 6/8/2011 | 6/8/2011 10:02:49 AM | | DONE |
|
|
still under construction electrical contractor will call for final
|
ELE11-01106
| Final | 6/7/2011 | 6/8/2011 | 6/8/2011 9:58:43 AM | A | NH |
|
|
Phone #: ###-#### >> Inspection requested via web by Daniel Schaffeld
|
ELE11-01127
| Final | 6/7/2011 | 6/8/2011 | 6/8/2011 9:17:33 AM | A | PASS |
|
|
Final inspection please. Contact is Bob Callahan. Thank you and have a great day. Phone #: ###-#### >> Inspection requested via web by Laura Longshaw final ok
|
ELE11-01182
| Electrical Rough-In | 6/7/2011 | 6/8/2011 | 6/8/2011 8:51:47 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok service panel for elevator equipment
|
ELE10-02134
| Conference | 6/7/2011 | 6/8/2011 | 6/8/2011 8:34:36 AM | A | DONE |
|
|
Chris is the contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Discussed location of sprinkler piping in service gear room, NO piping over foot print of service gear NEC 110.26(F)(1)(a)
|
ELE11-00869
| Final | 6/8/2011 | 6/8/2011 | 6/8/2011 8:21:58 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by David Seilheimer final ok
|