PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, June 8, 2012
.
Number of inspections:
38
Percentage of inspections complete:
84 %
Percentage of inspections not complete:
16 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC12-00164
Site Preparation
6/1/2012
6/1/2012
ESC12-00525
Site Preparation
6/1/2012
6/1/2012
ESC12-00530
Site Preparation
6/4/2012
6/4/2012
ESC11-00785
Aging Inspection
6/5/2012
6/5/2012
ESC12-00485
General Inspection
6/6/2012
6/6/2012
BLD12-01163
BLD-Footing
6/8/2012
6/8/2012
6/11/2012 8:45:43 AM
P
CANC
Ben Phone #: ###-####
BLD12-01065
BLD-Final
6/8/2012
6/8/2012
6/8/2012 4:49:15 PM
P
NR
David Phone #: ###-####
BLD12-01078
BLD-Final
6/8/2012
6/8/2012
6/8/2012 4:14:29 PM
P
DONE
Walter Phone #: ###-####
BLD12-01078
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 4:14:21 PM
P
PASS
All work appeared to be done in accordance with local codes and ordinances.
BLD12-01293
BLD-Final
6/8/2012
6/8/2012
6/8/2012 4:13:49 PM
P
DONE
Walter Phone #: ###-####
BLD12-01293
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 4:13:41 PM
P
PASS
All work appesred to be done in accordance with local codes and ordinances.
BLD11-02718
BLD-Final
6/8/2012
6/8/2012
6/8/2012 4:12:44 PM
P
DONE
Dave Baker Phone #: ###-####
BLD11-02718
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 4:12:35 PM
P
PASS
BLD12-00946
BLD-Framing/Rough-in
6/7/2012
6/8/2012
6/8/2012 3:33:25 PM
P
NR
Brad Phone #: ###-####. Air seal package needs to be completed prior to framing inspection.
BLD12-00515
BLD-Final
6/8/2012
6/8/2012
6/8/2012 3:32:51 PM
P
FAIL
Brett Phone #: ###-####. Provide CO2 detectors.
BLD12-00806
BLD-Framing/Rough-in
6/8/2012
6/8/2012
6/8/2012 1:46:28 PM
P
CANC
tim -basement only Phone #: ###-####
BLD12-00806
BLD-Energy code compliance
6/8/2012
6/8/2012
6/8/2012 1:46:11 PM
P
PASS
tim -basement only Phone #: ###-####
ESC12-00470
Site Preparation
6/8/2012
6/8/2012
6/8/2012 1:09:42 PM
P
PASS
BLD12-01120
BLD-Footing
6/8/2012
6/8/2012
6/8/2012 1:09:20 PM
P
PART
Chris Phone #: ###-####
ESC12-00152
General Inspection
6/8/2012
6/8/2012
6/8/2012 12:18:06 PM
A
PASS
BLD12-00360
BLD-Framing/Rough-in
6/7/2012
6/8/2012
6/8/2012 12:17:05 PM
A
FAIL
Adam Phone #: ###-####Provide attic access Aove master bedroom and living room, Complete lateral bracing on A2A atiic trusses, ACAP piggy back trusses require full bearing on bottom chord, repair bolts at garage portal frame. Correction notice posted, ok to insulate.
BLD12-01456
BLD-Framing/Rough-in
6/7/2012
6/8/2012
6/8/2012 11:31:42 AM
A
PART
Rick Phone #: ###-####. Deck framing only, Needs to remove soilsto get proper clearance on pressure treated wood.
ESC12-00019
Site Final
6/8/2012
6/8/2012
6/8/2012 10:43:55 AM
A
DONE
ESC12-00019
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 10:43:47 AM
P
PASS
ESC12-00353
General Inspection
6/8/2012
6/8/2012
6/8/2012 10:26:16 AM
A
PASS
BLD12-00830
BLD-Energy code compliance
6/7/2012
6/8/2012
6/8/2012 10:25:58 AM
A
PASS
Phone #: ###-#### >> Inspection requested via web by Peter Harris
ESC12-00492
BMP Violation
6/8/2012
6/8/2012
6/8/2012 10:20:04 AM
A
PASS
BLD12-01191
BLD-Foundation
6/6/2012
6/8/2012
6/8/2012 10:19:44 AM
A
PASS
Peter Phone #: ###-####
ESC12-00238
Site Final
6/8/2012
6/8/2012
6/8/2012 10:12:22 AM
A
DONE
ESC12-00238
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 10:12:13 AM
P
PASS
ESC12-00237
Site Final
6/8/2012
6/8/2012
6/8/2012 10:11:56 AM
A
PASS
ESC12-00237
DOC - Permit Finaled
6/8/2012
6/8/2012
6/8/2012 10:11:49 AM
P
PASS
BLD12-00543
BLD-Final
6/7/2012
6/8/2012
6/8/2012 10:11:29 AM
A
FAIL
Paul Phone #: ###-#### - call for access. Needs to provide the required energy cert and provide either the 3rd party inspection report for airseal ar framing or blower door test results and post. A corrction notice was issued.
BLD12-00542
BLD-Final
6/7/2012
6/8/2012
6/8/2012 10:10:14 AM
A
NR
Paul Phone #: ###-#### - call for access. Needs plumbing final. Also needs to provide the correct energy cert and 3rd party inspection or blower door. Did not do inspection.
GCB12-00009
GCB-Energy
6/7/2012
6/8/2012
6/8/2012 9:40:25 AM
A
PASS
Dave @ ###-####
Call in advance 30 mins. Plan mod and engineering will be sent to Sam Z. Insulation under stages installed and is ok.
GCB12-00057
GCB-Ceiling Grid
6/7/2012
6/8/2012
6/8/2012 8:02:41 AM
A
CANC
Chuck @ ###-####
AM inspection requested. Canceled by contractor via phone call.
BLD12-00869
BLD-Framing/Rough-in
6/6/2012
6/8/2012
6/7/2012 3:32:11 PM
P
CANC
Josh Phone #: ###-#### - call 30 mins prior. Needs mech. ri inspection.
ESC11-00408
General Inspection
6/8/2012
6/8/2012