Inspections for the day of: Friday, June 8, 2012.
Number of inspections: 38
Percentage of inspections complete: 84 %
Percentage of inspections not complete: 16 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00164 Site Preparation6/1/20126/1/2012   
ESC12-00525 Site Preparation6/1/20126/1/2012   
ESC12-00530 Site Preparation6/4/20126/4/2012   
ESC11-00785 Aging Inspection6/5/20126/5/2012   
ESC12-00485 General Inspection6/6/20126/6/2012   
BLD12-01163 BLD-Footing6/8/20126/8/20126/11/2012 8:45:43 AMPCANC
Ben Phone #: ###-####
BLD12-01065 BLD-Final6/8/20126/8/20126/8/2012 4:49:15 PMPNR
David Phone #: ###-####
BLD12-01078 BLD-Final6/8/20126/8/20126/8/2012 4:14:29 PMPDONE
Walter Phone #: ###-####
BLD12-01078 DOC - Permit Finaled6/8/20126/8/20126/8/2012 4:14:21 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD12-01293 BLD-Final6/8/20126/8/20126/8/2012 4:13:49 PMPDONE
Walter Phone #: ###-####
BLD12-01293 DOC - Permit Finaled6/8/20126/8/20126/8/2012 4:13:41 PMPPASS
All work appesred to be done in accordance with local codes and ordinances.
BLD11-02718 BLD-Final6/8/20126/8/20126/8/2012 4:12:44 PMPDONE
Dave Baker Phone #: ###-####
BLD11-02718 DOC - Permit Finaled6/8/20126/8/20126/8/2012 4:12:35 PMPPASS
BLD12-00946 BLD-Framing/Rough-in6/7/20126/8/20126/8/2012 3:33:25 PMPNR
Brad Phone #: ###-####. Air seal package needs to be completed prior to framing inspection.
BLD12-00515 BLD-Final6/8/20126/8/20126/8/2012 3:32:51 PMPFAIL
Brett Phone #: ###-####. Provide CO2 detectors.
BLD12-00806 BLD-Framing/Rough-in6/8/20126/8/20126/8/2012 1:46:28 PMPCANC
tim -basement only Phone #: ###-####
BLD12-00806 BLD-Energy code compliance6/8/20126/8/20126/8/2012 1:46:11 PMPPASS
tim -basement only Phone #: ###-####
ESC12-00470 Site Preparation6/8/20126/8/20126/8/2012 1:09:42 PMPPASS
BLD12-01120 BLD-Footing6/8/20126/8/20126/8/2012 1:09:20 PMPPART
Chris Phone #: ###-####
ESC12-00152 General Inspection6/8/20126/8/20126/8/2012 12:18:06 PMAPASS
BLD12-00360 BLD-Framing/Rough-in6/7/20126/8/20126/8/2012 12:17:05 PMAFAIL
Adam Phone #: ###-####Provide attic access Aove master bedroom and living room, Complete lateral bracing on A2A atiic trusses, ACAP piggy back trusses require full bearing on bottom chord, repair bolts at garage portal frame. Correction notice posted, ok to insulate.
BLD12-01456 BLD-Framing/Rough-in6/7/20126/8/20126/8/2012 11:31:42 AMAPART
Rick Phone #: ###-####. Deck framing only, Needs to remove soilsto get proper clearance on pressure treated wood.
ESC12-00019 Site Final6/8/20126/8/20126/8/2012 10:43:55 AMADONE
ESC12-00019 DOC - Permit Finaled6/8/20126/8/20126/8/2012 10:43:47 AMPPASS
ESC12-00353 General Inspection6/8/20126/8/20126/8/2012 10:26:16 AMAPASS
BLD12-00830 BLD-Energy code compliance6/7/20126/8/20126/8/2012 10:25:58 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Peter Harris
ESC12-00492 BMP Violation6/8/20126/8/20126/8/2012 10:20:04 AMAPASS
BLD12-01191 BLD-Foundation6/6/20126/8/20126/8/2012 10:19:44 AMAPASS
Peter Phone #: ###-####
ESC12-00238 Site Final6/8/20126/8/20126/8/2012 10:12:22 AMADONE
ESC12-00238 DOC - Permit Finaled6/8/20126/8/20126/8/2012 10:12:13 AMPPASS
ESC12-00237 Site Final6/8/20126/8/20126/8/2012 10:11:56 AMAPASS
ESC12-00237 DOC - Permit Finaled6/8/20126/8/20126/8/2012 10:11:49 AMPPASS
BLD12-00543 BLD-Final6/7/20126/8/20126/8/2012 10:11:29 AMAFAIL
Paul Phone #: ###-#### - call for access. Needs to provide the required energy cert and provide either the 3rd party inspection report for airseal ar framing or blower door test results and post. A corrction notice was issued.
BLD12-00542 BLD-Final6/7/20126/8/20126/8/2012 10:10:14 AMANR
Paul Phone #: ###-#### - call for access. Needs plumbing final. Also needs to provide the correct energy cert and 3rd party inspection or blower door. Did not do inspection.
GCB12-00009 GCB-Energy6/7/20126/8/20126/8/2012 9:40:25 AMAPASS
Dave @ ###-####
Call in advance 30 mins. Plan mod and engineering will be sent to Sam Z. Insulation under stages installed and is ok.
GCB12-00057 GCB-Ceiling Grid6/7/20126/8/20126/8/2012 8:02:41 AMACANC
Chuck @ ###-####
AM inspection requested. Canceled by contractor via phone call.
BLD12-00869 BLD-Framing/Rough-in6/6/20126/8/20126/7/2012 3:32:11 PMPCANC
Josh Phone #: ###-#### - call 30 mins prior. Needs mech. ri inspection.
ESC11-00408 General Inspection6/8/20126/8/2012