BLD14-02369
| BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 4:10:50 PM | P | PASS |
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD15-00700
| BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 4:10:23 PM | P | PASS |
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD15-00701
| BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 4:09:44 PM | P | PASS |
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD15-00703
| BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 4:09:06 PM | P | PASS |
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD15-01740
| BLD-Final | 6/8/2015 | 6/8/2015 | 6/8/2015 3:42:56 PM | P | PART |
|
|
Nathan Phone #: ###-#### framing ok pending exterior covering
|
BLD14-00681
| BLD-Other | 6/8/2015 | 6/8/2015 | 6/8/2015 3:01:50 PM | P | PART |
|
|
sofits; Jose Phone #: ###-#### ceilling ok pool house area.
|
BLD15-01626
| BLD-Foundation | 6/5/2015 | 6/8/2015 | 6/8/2015 2:16:33 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD14-03486
| BLD-Ceiling Grid Inspection | 6/5/2015 | 6/8/2015 | 6/8/2015 2:16:03 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy
|
BLD15-01622
| BLD-Footing | 6/5/2015 | 6/8/2015 | 6/8/2015 10:53:14 AM | A | PASS |
|
|
Eric Phone #: ###-####
|
BLD15-01878
| BLD-Foundation | 6/5/2015 | 6/8/2015 | 6/8/2015 9:49:33 AM | A | PASS |
|
|
Larry Phone #: ###-####
|
BLD15-01397
| BLD-Conference | 6/6/2015 | 6/8/2015 | 6/8/2015 9:19:16 AM | A | PART |
|
|
Working over night shifts on this project. If at all possible could inspections be scheduled as early as possible. Would like to schedule rough frame inspection for new consultation room.
Ron Hack/ESI ###-#### Phone #: ###-#### Inspection requested via web by Ron Hack framing ok conf rm pending ele demizing wall ok
|
BLD15-01219
| BLD-Final | 6/5/2015 | 6/8/2015 | 6/5/2015 5:01:00 PM | A | DEFR |
|
|
Ashley Phone #: ###-#### out of time
|