FIR16-00152
| INSP-Sprinkler Rough-in | 6/8/2016 | 6/8/2016 | 6/8/2016 2:49:12 PM | P | PASS |
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
BLD16-01968
| FIRE-Final Inspection | 6/6/2016 | 6/8/2016 | 6/8/2016 2:48:23 PM | A | CANC |
|
|
Timothy was not able to meet me when I was available.
|
FIR16-00332
| INSP-Final Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 11:05:39 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00131
| INSP-Sprinkler Rough-in/Hydro | 6/7/2016 | 6/8/2016 | 6/8/2016 10:58:38 AM | A | PASS |
|
|
The overhead hydros for Foam Gen. System, Wet Hanger, Hose System and the Test Header side of the Pump Room piping passed inspection.
|
FIR15-00709
| INSP-Sprinkler Rough-in | 6/7/2016 | 6/8/2016 | 6/8/2016 10:56:39 AM | A | PASS |
|
|
The piping above the second and third floor hardlid at the west stairs is ok to cover and the second floor elevator lobby piping is ok to cover.
|
FIR15-00822
| INSP-Final Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 6:56:22 AM | A | PART |
|
|
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
|
BLD15-01869
| BLD-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 6:55:47 AM | A | PART |
|
|
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
|