Inspections for the day of: Wednesday, June 8, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF16-00031 INSP-Final6/8/20166/8/20166/8/2016 3:42:09 PMPPART
Duct detector operation/HVAC unit shutdown verified. Audio visual devices tested, A/V's in restrooms need to be weather-proof devices due to the exposure of moisture from the shower. Contractor will schedule a final inspection when weather-proof devices are installed.
BLD15-03871 FIRE-Final Inspection6/8/20166/8/20166/8/2016 2:14:58 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, commercial hood suppression system inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIR16-00008 INSP-Sprinkler Rough-in/Hydro6/6/20166/8/20166/8/2016 2:12:35 PMPCANC
Hydrostatic test for overhead piping for level 2 cancelled per conversation with point of contact, hydrostatic test will be rescheduled for later date.
BLD15-02358 FIRE-Final Inspection6/8/20166/8/20166/8/2016 2:08:51 PMPPART
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for clubhouse passed/complete. Cannot final life fire safety inspection for permit until exit gate from pool area has panic hardware installed with path of travel swinging out for gate. Pool area needs to have occupancy placard installed, once these items are corrected/inspected then life fire safety can be finaled.
FIR16-00325 INSP-Sprinkler Rough-in/Hydro6/8/20166/8/20166/8/2016 1:10:03 PMPPASS
Final fire alarm inspection complete.
BLD16-01926 FIRE-Final Inspection6/2/20166/8/20166/8/2016 9:49:14 AMAPASS
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Main entry appears to have thumbturn deadbolt door hardware, deadbolt assembly has been removed. Final life fire safety inspection passed/complete.
BLD16-01713 FIRE-Final Inspection6/7/20166/8/20166/8/2016 9:30:10 AMAPART
Project being worked in phases, phase 1 (Level 3 lobby/restrooms) restrooms are comlete, exit signs were being replaced at time of inspection, will verify exit sign placement during inspection for level 2. Fire sprinklers complete for level 3, no fire alarm modifications, fire extinguisher in place with current inspection tag. Final life fire safety inspection complete for level 3.
BLD16-01145 FIRE-Final Inspection6/7/20166/8/20166/8/2016 9:26:55 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, discussed mounting location for fire extinguisher, fire extinguisher has current inspection tag. Final life fire safety inspection passed/complete.
FIR16-00366 INSP-Final Inspection6/6/20166/8/20166/8/2016 9:22:03 AMAPASS
Rough in inspection was completed with this inspection request, final fire sprinkler inspection completed under this inspection request. Final inspection for third floor lobby/restrooms passed/complete.
FIR16-00286 INSP-Final Inspection6/6/20166/8/20166/8/2016 9:12:14 AMAPASS
Rough in inspection was completed with this inspection request, final fire sprinkler inspection completed under this inspection request. Final inspection passed/complete.
FIR16-00306 INSP-Final Inspection6/7/20166/8/20166/8/2016 9:07:07 AMAPASS
Final fire alarm inspection passed/complete